Fleece Fabric Sourcing Program for Denim Mills
Fleece Fabric Programme for Denim Mills
This programme covers the full path from a fleece fabric requirement to a repeatable bulk supply for denim mills. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 180 gsm, the finish and the packing, and we hold that specification so every reorder matches the last one.
The most common failure in fleece fabric sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

What the programme covers
- Specification build from your tech pack or a physical reference sample
- Base material and finish options with costed alternatives
- Sampling, testing and approval against CPSIA
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
Recommended specifications
- Nylon — selected for colour depth and finish stability
- Recycled PET — selected for colour depth and finish stability
- TPU — best balance of cost, availability and test performance
- Ceramic — selected for colour depth and finish stability

Programme parameters
| Item | Fleece Fabric |
|---|---|
| Target sector | Denim Mills |
| Standard size | 180 gsm |
| Finish options | Antique Copper Finish, Anodised Finish, UV Printing |
| Processes | Water Repellent Finishing, Weft Knitting, Yarn Dyeing |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 25-55 days |
| Compliance | CPSIA |
| Delivery terms | EXW / FOB / CIF / DDP |
Why buyers choose this route
- One accountable owner from sampling through to ex-factory
- Consolidated shipping with documented carton ratios
- AQL inspection on every bulk lot with photo reporting before balance payment
- Golden sample retained at the factory and a second one held by the buyer
- Compliance documentation issued with the shipment, not after it
How the programme runs
- Discovery call: quantity, target price, delivery window and compliance needs
- Material and finish proposal with costed alternatives
- Counter sample built from your tech pack or reference sample
- Approval, testing and pre-production sign-off
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
FAQ
What happens if a bulk lot fails inspection?
The lot is reworked or remade at our cost. Inspection reports are shared before the balance payment is due.
Which compliance documents do you provide?
CPSIA documentation is issued with the shipment. Test reports can be ordered against any additional standard you nominate.
Can you handle our own artwork or tooling?
Yes. Artwork files or existing tooling can be used; we confirm tolerances in writing before the first production run.
Do you hold stock for reorders?
Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.
If you are comparing suppliers, send us the spec they quoted against. We will quote the same spec and show you where the difference sits.



