Rib Knit Fabric Sourcing Program for Lingerie Brands
Rib Knit Fabric Programme for Lingerie Brands
This programme covers the full path from a rib knit fabric requirement to a repeatable bulk supply for lingerie brands. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 400 gsm, the finish and the packing, and we hold that specification so every reorder matches the last one.
The most common failure in rib knit fabric sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

What the programme covers
- Specification build from your tech pack or a physical reference sample
- Base material and finish options with costed alternatives
- Sampling, testing and approval against RoHS
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
Recommended specifications
- Glass — chosen when the item has to survive repeated laundering
- Acrylic — chosen when the item has to survive repeated laundering
- Polyester — chosen when the item has to survive repeated laundering
- Recycled PET — best balance of cost, availability and test performance

Programme parameters
| Item | Rib Knit Fabric |
|---|---|
| Target sector | Lingerie Brands |
| Standard size | 400 gsm |
| Finish options | Glossy Enamel Coating, Black Nickel Finish, UV Printing |
| Processes | Brushing, UV Protection Finishing, Heat Setting |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 25-40 days |
| Compliance | RoHS |
| Delivery terms | EXW / FOB / CIF / DDP |
Why buyers choose this route
- Golden sample retained at the factory and a second one held by the buyer
- MOQ quoted per style per colourway, stated before sampling starts
- AQL inspection on every bulk lot with photo reporting before balance payment
- Compliance documentation issued with the shipment, not after it
- Plating and dyeing sub-processes planned into the quoted lead time
How the programme runs
- Discovery call: quantity, target price, delivery window and compliance needs
- Material and finish proposal with costed alternatives
- Counter sample built from your tech pack or reference sample
- Approval, testing and pre-production sign-off
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
FAQ
Do you hold stock for reorders?
Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.
Which compliance documents do you provide?
RoHS documentation is issued with the shipment. Test reports can be ordered against any additional standard you nominate.
What happens if a bulk lot fails inspection?
The lot is reworked or remade at our cost. Inspection reports are shared before the balance payment is due.
What is the minimum order quantity?
Standard MOQ is 1000 per style per colour. Mixed colourways can be combined on the same spec if the base material is identical.
Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.



