Welcome to Arts & Crafts-oopcc.com official website!

Sleeve Head Sourcing Program for E-commerce Sellers: Home Curtains

Source:Solution / Time:2026-09-18

Sleeve Head Programme for E-commerce Sellers: Home Curtains

This programme covers the full path from a sleeve head requirement to a repeatable bulk supply for e-commerce sellers. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 10# Gauge, the finish and the packing, and we hold that specification so every reorder matches the last one. It is built around home curtains, which is where most of the specification detail sits.

The most common failure in sleeve head sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

Sleeve Head for E-commerce Sellers

What the programme covers

  • Specification build from your tech pack or a physical reference sample
  • Base material and finish options with costed alternatives
  • Sampling, testing and approval against OEKO-TEX Standard 100
  • Bulk production with in-line inspection and photo reporting
  • Packing, documentation and shipment under the agreed Incoterm

Recommended specifications

  • Bamboo — best balance of cost, availability and test performance
  • Stainless Steel — selected for colour depth and finish stability
  • Rubber — used when strength and abrasion resistance come first
  • Brass — selected for colour depth and finish stability

Sleeve Head specification

Programme parameters

ItemSleeve Head
Target sectorE-commerce Sellers
Target applicationHome Curtains
Standard size10# Gauge
Finish optionsBlack Nickel Finish, Enzyme Wash Finish, Piece-Dyed Finish
ProcessesAnti-Pilling Finish, Heat Transfer Printing, Warp Knitting
MOQ3,000 pieces per specification
Sampling7 working days, 5 days per revision
Bulk lead time15-30 days
ComplianceOEKO-TEX Standard 100
Delivery termsEXW / FOB / CIF / DDP

Why buyers choose this route

  • Written specification held on file, so every reorder reproduces the approved sample
  • Compliance documentation issued with the shipment, not after it
  • AQL inspection on every bulk lot with photo reporting before balance payment
  • Golden sample retained at the factory and a second one held by the buyer
  • One accountable owner from sampling through to ex-factory

How the programme runs

  1. Discovery call: quantity, target price, delivery window and compliance needs
  2. Material and finish proposal with costed alternatives
  3. Counter sample built from your tech pack or reference sample
  4. Approval, testing and pre-production sign-off
  5. Bulk production with in-line inspection and photo reporting
  6. Packing, documentation and shipment under the agreed Incoterm

FAQ

Which compliance documents do you provide?

OEKO-TEX Standard 100 documentation is issued with the shipment. Test reports can be ordered against any additional standard you nominate.

How long does sampling take?

7 working days for the first sample, with 5 days per revision round. Plated or dyed-to-match items add a few days.

Do you hold stock for reorders?

Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.

Can you handle our own artwork or tooling?

Yes. Artwork files or existing tooling can be used; we confirm tolerances in writing before the first production run.

Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top