Size Sticker Sourcing Program for Towel and Bathrobe Mills: Bags
Size Sticker Programme for Towel and Bathrobe Mills: Bags
This programme covers the full path from a size sticker requirement to a repeatable bulk supply for towel and bathrobe mills. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 5# Gauge, the finish and the packing, and we hold that specification so every reorder matches the last one. It is built around bags, which is where most of the specification detail sits.
The most common failure in size sticker sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

What the programme covers
- Specification build from your tech pack or a physical reference sample
- Base material and finish options with costed alternatives
- Sampling, testing and approval against EN 71-3
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
Recommended specifications
- Brass — used when strength and abrasion resistance come first
- Polyester — best balance of cost, availability and test performance
- Zinc Alloy — chosen when the item has to survive repeated laundering
- Genuine Leather — selected for colour depth and finish stability

Programme parameters
| Item | Size Sticker |
|---|---|
| Target sector | Towel and Bathrobe Mills |
| Target application | Bags |
| Standard size | 5# Gauge |
| Finish options | Nickel-Free Electroplating, Soft-Touch Rubber Coating, Yarn-Dyed Finish |
| Processes | Enzyme Washing, UV Protection Finishing, Laser Cutting |
| MOQ | 500 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 15-30 days |
| Compliance | EN 71-3 |
| Delivery terms | EXW / FOB / CIF / DDP |
Why buyers choose this route
- Consolidated shipping with documented carton ratios
- Golden sample retained at the factory and a second one held by the buyer
- One accountable owner from sampling through to ex-factory
- MOQ quoted per style per colourway, stated before sampling starts
- Plating and dyeing sub-processes planned into the quoted lead time
How the programme runs
- Discovery call: quantity, target price, delivery window and compliance needs
- Material and finish proposal with costed alternatives
- Counter sample built from your tech pack or reference sample
- Approval, testing and pre-production sign-off
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
FAQ
What are the payment and delivery terms?
Standard terms are a deposit with the order and the balance before shipment, under EXW / FOB / CIF / DDP as agreed.
Can you handle our own artwork or tooling?
Yes. Artwork files or existing tooling can be used; we confirm tolerances in writing before the first production run.
Do you hold stock for reorders?
Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.
Which compliance documents do you provide?
EN 71-3 documentation is issued with the shipment. Test reports can be ordered against any additional standard you nominate.
Send the reference sample or tech pack and we will come back with a costed specification, a sampling timetable and the compliance documents your market requires.