Welcome to Arts & Crafts-oopcc.com official website!

Flannel Fabric Sourcing Program for Footwear Manufacturers: Swimwear

Source:Solution / Time:2026-09-18

Flannel Fabric Programme for Footwear Manufacturers: Swimwear

This programme covers the full path from a flannel fabric requirement to a repeatable bulk supply for footwear manufacturers. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 140 gsm, the finish and the packing, and we hold that specification so every reorder matches the last one. It is built around swimwear, which is where most of the specification detail sits.

The most common failure in flannel fabric sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

Flannel Fabric for Footwear Manufacturers

What the programme covers

  • Specification build from your tech pack or a physical reference sample
  • Base material and finish options with costed alternatives
  • Sampling, testing and approval against ISO 12947 Abrasion Resistance
  • Bulk production with in-line inspection and photo reporting
  • Packing, documentation and shipment under the agreed Incoterm

Recommended specifications

  • Recycled PET — chosen when the item has to survive repeated laundering
  • Nylon — used when strength and abrasion resistance come first
  • Cotton — chosen when the item has to survive repeated laundering
  • ABS Resin — best balance of cost, availability and test performance

Flannel Fabric specification

Programme parameters

ItemFlannel Fabric
Target sectorFootwear Manufacturers
Target applicationSwimwear
Standard size140 gsm
Finish optionsLaser Engraved Finish, Rose Gold Plating, Antique Copper Finish
ProcessesAnodising, Screen Printing, Stone Washing
MOQ2,000 pieces per specification
Sampling7 working days, 3 days per revision
Bulk lead time15-55 days
ComplianceISO 12947 Abrasion Resistance
Delivery termsEXW / FOB / CIF / DDP

Why buyers choose this route

  • Trim and fabric sourced from audited mills with test reports on file
  • Consolidated shipping with documented carton ratios
  • One accountable owner from sampling through to ex-factory
  • Written specification held on file, so every reorder reproduces the approved sample
  • Costed alternatives shown at quotation so the trade-off is visible

How the programme runs

  1. Discovery call: quantity, target price, delivery window and compliance needs
  2. Material and finish proposal with costed alternatives
  3. Counter sample built from your tech pack or reference sample
  4. Approval, testing and pre-production sign-off
  5. Bulk production with in-line inspection and photo reporting
  6. Packing, documentation and shipment under the agreed Incoterm

FAQ

How long does sampling take?

7 working days for the first sample, with 3 days per revision round. Plated or dyed-to-match items add a few days.

Can you match a physical sample?

Yes. Send the reference and we reverse engineer the specification, then produce a counter sample for approval before any bulk commitment.

Which compliance documents do you provide?

ISO 12947 Abrasion Resistance documentation is issued with the shipment. Test reports can be ordered against any additional standard you nominate.

Do you hold stock for reorders?

Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.

Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top