Welcome to Arts & Crafts-oopcc.com official website!

Cord End Sourcing Program for Costume and Theatre: Evening Wear

Source:Solution / Time:2026-09-18

Cord End Programme for Costume and Theatre: Evening Wear

This programme covers the full path from a cord end requirement to a repeatable bulk supply for costume and theatre. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 20 mm Width, the finish and the packing, and we hold that specification so every reorder matches the last one. It is built around evening wear, which is where most of the specification detail sits.

The most common failure in cord end sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

Cord End for Costume and Theatre

What the programme covers

  • Specification build from your tech pack or a physical reference sample
  • Base material and finish options with costed alternatives
  • Sampling, testing and approval against REACH SVHC Screening
  • Bulk production with in-line inspection and photo reporting
  • Packing, documentation and shipment under the agreed Incoterm

Recommended specifications

  • Silicone — best balance of cost, availability and test performance
  • ABS Resin — chosen when the item has to survive repeated laundering
  • Brass — used when strength and abrasion resistance come first
  • Rubber — chosen when the item has to survive repeated laundering

Cord End specification

Programme parameters

ItemCord End
Target sectorCostume and Theatre
Target applicationEvening Wear
Standard size20 mm Width
Finish optionsPiece-Dyed Finish, Enzyme Wash Finish, Laser Engraved Finish
ProcessesLaser Cutting, Anti-Bacterial Finishing, Calendering
MOQ2,000 pieces per specification
Sampling10 working days, 5 days per revision
Bulk lead time20-55 days
ComplianceREACH SVHC Screening
Delivery termsEXW / FOB / CIF / DDP

Why buyers choose this route

  • One accountable owner from sampling through to ex-factory
  • Golden sample retained at the factory and a second one held by the buyer
  • Plating and dyeing sub-processes planned into the quoted lead time
  • AQL inspection on every bulk lot with photo reporting before balance payment
  • Compliance documentation issued with the shipment, not after it

How the programme runs

  1. Discovery call: quantity, target price, delivery window and compliance needs
  2. Material and finish proposal with costed alternatives
  3. Counter sample built from your tech pack or reference sample
  4. Approval, testing and pre-production sign-off
  5. Bulk production with in-line inspection and photo reporting
  6. Packing, documentation and shipment under the agreed Incoterm

FAQ

Can you match a physical sample?

Yes. Send the reference and we reverse engineer the specification, then produce a counter sample for approval before any bulk commitment.

How long does sampling take?

10 working days for the first sample, with 5 days per revision round. Plated or dyed-to-match items add a few days.

What happens if a bulk lot fails inspection?

The lot is reworked or remade at our cost. Inspection reports are shared before the balance payment is due.

Do you hold stock for reorders?

Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.

Send the reference sample or tech pack and we will come back with a costed specification, a sampling timetable and the compliance documents your market requires.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top