Anti-Bacterial Fabric Sourcing Program for Denim Mills: Bras
Anti-Bacterial Fabric Programme for Denim Mills: Bras
This programme covers the full path from a anti-bacterial fabric requirement to a repeatable bulk supply for denim mills. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 360 gsm, the finish and the packing, and we hold that specification so every reorder matches the last one. It is built around bras, which is where most of the specification detail sits.
The most common failure in anti-bacterial fabric sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

What the programme covers
- Specification build from your tech pack or a physical reference sample
- Base material and finish options with costed alternatives
- Sampling, testing and approval against EN 71-3
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
Recommended specifications
- POM Plastic — selected for colour depth and finish stability
- Nickel Silver — used when strength and abrasion resistance come first
- Polyester — used when strength and abrasion resistance come first
- Recycled PET — chosen when the item has to survive repeated laundering

Programme parameters
| Item | Anti-Bacterial Fabric |
|---|---|
| Target sector | Denim Mills |
| Target application | Bras |
| Standard size | 360 gsm |
| Finish options | Black Nickel Finish, Pearlescent Coating, Sandblasted Finish |
| Processes | Electroplating, Enzyme Washing, Epoxy Coating |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 20-55 days |
| Compliance | EN 71-3 |
| Delivery terms | EXW / FOB / CIF / DDP |
Why buyers choose this route
- Written specification held on file, so every reorder reproduces the approved sample
- Plating and dyeing sub-processes planned into the quoted lead time
- One accountable owner from sampling through to ex-factory
- Golden sample retained at the factory and a second one held by the buyer
- MOQ quoted per style per colourway, stated before sampling starts
How the programme runs
- Discovery call: quantity, target price, delivery window and compliance needs
- Material and finish proposal with costed alternatives
- Counter sample built from your tech pack or reference sample
- Approval, testing and pre-production sign-off
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
FAQ
What happens if a bulk lot fails inspection?
The lot is reworked or remade at our cost. Inspection reports are shared before the balance payment is due.
What is the minimum order quantity?
Standard MOQ is 3000 per style per colour. Mixed colourways can be combined on the same spec if the base material is identical.
How long does sampling take?
10 working days for the first sample, with 5 days per revision round. Plated or dyed-to-match items add a few days.
What are the payment and delivery terms?
Standard terms are a deposit with the order and the balance before shipment, under EXW / FOB / CIF / DDP as agreed.
Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.