Bra Strap Sourcing Program for Chef Wear Suppliers: Coats
Bra Strap Programme for Chef Wear Suppliers: Coats
This programme covers the full path from a bra strap requirement to a repeatable bulk supply for chef wear suppliers. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 25 mm Width, the finish and the packing, and we hold that specification so every reorder matches the last one. It is built around coats, which is where most of the specification detail sits.
The most common failure in bra strap sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

What the programme covers
- Specification build from your tech pack or a physical reference sample
- Base material and finish options with costed alternatives
- Sampling, testing and approval against ISO 14001
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
Recommended specifications
- Rubber — best balance of cost, availability and test performance
- Zinc Alloy — chosen when the item has to survive repeated laundering
- Copper — best balance of cost, availability and test performance
- POM Plastic — best balance of cost, availability and test performance

Programme parameters
| Item | Bra Strap |
|---|---|
| Target sector | Chef Wear Suppliers |
| Target application | Coats |
| Standard size | 25 mm Width |
| Finish options | Yarn-Dyed Finish, Rose Gold Plating, Piece-Dyed Finish |
| Processes | Epoxy Coating, Heat Transfer Printing, Digital Printing |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 25-30 days |
| Compliance | ISO 14001 |
| Delivery terms | EXW / FOB / CIF / DDP |
Why buyers choose this route
- Costed alternatives shown at quotation so the trade-off is visible
- One accountable owner from sampling through to ex-factory
- MOQ quoted per style per colourway, stated before sampling starts
- Written specification held on file, so every reorder reproduces the approved sample
- AQL inspection on every bulk lot with photo reporting before balance payment
How the programme runs
- Discovery call: quantity, target price, delivery window and compliance needs
- Material and finish proposal with costed alternatives
- Counter sample built from your tech pack or reference sample
- Approval, testing and pre-production sign-off
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
FAQ
Which compliance documents do you provide?
ISO 14001 documentation is issued with the shipment. Test reports can be ordered against any additional standard you nominate.
How long does sampling take?
7 working days for the first sample, with 3 days per revision round. Plated or dyed-to-match items add a few days.
What are the payment and delivery terms?
Standard terms are a deposit with the order and the balance before shipment, under EXW / FOB / CIF / DDP as agreed.
What happens if a bulk lot fails inspection?
The lot is reworked or remade at our cost. Inspection reports are shared before the balance payment is due.
Send the reference sample or tech pack and we will come back with a costed specification, a sampling timetable and the compliance documents your market requires.