French Terry Fabric Sourcing Program for Sock and Hosiery Makers: Shirts
French Terry Fabric Programme for Sock and Hosiery Makers: Shirts
This programme covers the full path from a french terry fabric requirement to a repeatable bulk supply for sock and hosiery makers. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 320 gsm, the finish and the packing, and we hold that specification so every reorder matches the last one. It is built around shirts, which is where most of the specification detail sits.
The most common failure in french terry fabric sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

What the programme covers
- Specification build from your tech pack or a physical reference sample
- Base material and finish options with costed alternatives
- Sampling, testing and approval against OEKO-TEX Standard 100
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
Recommended specifications
- Nickel Silver — chosen when the item has to survive repeated laundering
- Glass — chosen when the item has to survive repeated laundering
- Wood — selected for colour depth and finish stability
- PU Leather — best balance of cost, availability and test performance

Programme parameters
| Item | French Terry Fabric |
|---|---|
| Target sector | Sock and Hosiery Makers |
| Target application | Shirts |
| Standard size | 320 gsm |
| Finish options | Glossy Enamel Coating, Silicone Wash Finish, Pearlescent Coating |
| Processes | UV Protection Finishing, Anti-Bacterial Finishing, Anodising |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 20-40 days |
| Compliance | OEKO-TEX Standard 100 |
| Delivery terms | EXW / FOB / CIF / DDP |
Why buyers choose this route
- Trim and fabric sourced from audited mills with test reports on file
- MOQ quoted per style per colourway, stated before sampling starts
- Compliance documentation issued with the shipment, not after it
- Consolidated shipping with documented carton ratios
- Written specification held on file, so every reorder reproduces the approved sample
How the programme runs
- Discovery call: quantity, target price, delivery window and compliance needs
- Material and finish proposal with costed alternatives
- Counter sample built from your tech pack or reference sample
- Approval, testing and pre-production sign-off
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
FAQ
Which compliance documents do you provide?
OEKO-TEX Standard 100 documentation is issued with the shipment. Test reports can be ordered against any additional standard you nominate.
What are the payment and delivery terms?
Standard terms are a deposit with the order and the balance before shipment, under EXW / FOB / CIF / DDP as agreed.
Do you hold stock for reorders?
Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.
How long does sampling take?
7 working days for the first sample, with 3 days per revision round. Plated or dyed-to-match items add a few days.
Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.