Welcome to Arts & Crafts-oopcc.com official website!

Boiled Wool Fabric Sourcing Program for Hotel Groups: Home Curtains

Source:Solution / Time:2026-09-18

Boiled Wool Fabric Programme for Hotel Groups: Home Curtains

This programme covers the full path from a boiled wool fabric requirement to a repeatable bulk supply for hotel groups. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 320 gsm, the finish and the packing, and we hold that specification so every reorder matches the last one. It is built around home curtains, which is where most of the specification detail sits.

The most common failure in boiled wool fabric sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

Boiled Wool Fabric for Hotel Groups

What the programme covers

  • Specification build from your tech pack or a physical reference sample
  • Base material and finish options with costed alternatives
  • Sampling, testing and approval against ISO 9001
  • Bulk production with in-line inspection and photo reporting
  • Packing, documentation and shipment under the agreed Incoterm

Recommended specifications

  • PU Leather — best balance of cost, availability and test performance
  • Genuine Leather — used when strength and abrasion resistance come first
  • Aluminium — chosen when the item has to survive repeated laundering
  • ABS Resin — chosen when the item has to survive repeated laundering

Boiled Wool Fabric specification

Programme parameters

ItemBoiled Wool Fabric
Target sectorHotel Groups
Target applicationHome Curtains
Standard size320 gsm
Finish optionsAntique Copper Finish, Rainbow Iridescent Finish, Yarn-Dyed Finish
ProcessesAnti-Static Finishing, Ultrasonic Welding, Yarn Dyeing
MOQ500 pieces per specification
Sampling14 working days, 5 days per revision
Bulk lead time20-40 days
ComplianceISO 9001
Delivery termsEXW / FOB / CIF / DDP

Why buyers choose this route

  • Consolidated shipping with documented carton ratios
  • Costed alternatives shown at quotation so the trade-off is visible
  • Golden sample retained at the factory and a second one held by the buyer
  • MOQ quoted per style per colourway, stated before sampling starts
  • Plating and dyeing sub-processes planned into the quoted lead time

How the programme runs

  1. Discovery call: quantity, target price, delivery window and compliance needs
  2. Material and finish proposal with costed alternatives
  3. Counter sample built from your tech pack or reference sample
  4. Approval, testing and pre-production sign-off
  5. Bulk production with in-line inspection and photo reporting
  6. Packing, documentation and shipment under the agreed Incoterm

FAQ

Do you hold stock for reorders?

Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.

What happens if a bulk lot fails inspection?

The lot is reworked or remade at our cost. Inspection reports are shared before the balance payment is due.

Which compliance documents do you provide?

ISO 9001 documentation is issued with the shipment. Test reports can be ordered against any additional standard you nominate.

How long does sampling take?

14 working days for the first sample, with 5 days per revision round. Plated or dyed-to-match items add a few days.

Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top