Fabric Button Sourcing Program for PPE Distributors: Gloves
Fabric Button Programme for PPE Distributors: Gloves
This programme covers the full path from a fabric button requirement to a repeatable bulk supply for ppe distributors. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 25 mm Width, the finish and the packing, and we hold that specification so every reorder matches the last one. It is built around gloves, which is where most of the specification detail sits.
The most common failure in fabric button sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

What the programme covers
- Specification build from your tech pack or a physical reference sample
- Base material and finish options with costed alternatives
- Sampling, testing and approval against OEKO-TEX Standard 100
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
Recommended specifications
- Cotton — used when strength and abrasion resistance come first
- POM Plastic — selected for colour depth and finish stability
- Genuine Leather — best balance of cost, availability and test performance
- Polyester — best balance of cost, availability and test performance

Programme parameters
| Item | Fabric Button |
|---|---|
| Target sector | PPE Distributors |
| Target application | Gloves |
| Standard size | 25 mm Width |
| Finish options | Mercerised Finish, Soft-Touch Rubber Coating, Piece-Dyed Finish |
| Processes | Sublimation Printing, Injection Moulding, Enzyme Washing |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 20-40 days |
| Compliance | OEKO-TEX Standard 100 |
| Delivery terms | EXW / FOB / CIF / DDP |
Why buyers choose this route
- MOQ quoted per style per colourway, stated before sampling starts
- AQL inspection on every bulk lot with photo reporting before balance payment
- Compliance documentation issued with the shipment, not after it
- One accountable owner from sampling through to ex-factory
- Trim and fabric sourced from audited mills with test reports on file
How the programme runs
- Discovery call: quantity, target price, delivery window and compliance needs
- Material and finish proposal with costed alternatives
- Counter sample built from your tech pack or reference sample
- Approval, testing and pre-production sign-off
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
FAQ
What happens if a bulk lot fails inspection?
The lot is reworked or remade at our cost. Inspection reports are shared before the balance payment is due.
Can you handle our own artwork or tooling?
Yes. Artwork files or existing tooling can be used; we confirm tolerances in writing before the first production run.
What are the payment and delivery terms?
Standard terms are a deposit with the order and the balance before shipment, under EXW / FOB / CIF / DDP as agreed.
Do you hold stock for reorders?
Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.
Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.



