Sherpa Fabric with Anodised Finish for Swimwear
This sherpa fabric is supplied to a written specification so that reorders match the approved sample. The fabric construction is fixed at quotation stage — base material, the anodised finish surface, the 240 gsm and the packing — and held on file, which is what keeps swimwear consistent across seasons instead of drifting with whatever the mill happens to have in stock.
The usual reason buyers come to us is not price. It is reorders that quietly changed supplier and changed the hand feel, or a spec that lived in an email instead of a tech pack. Both are preventable once the specification is written down before bulk starts.

Specification
| Product | Sherpa Fabric |
|---|---|
| Finish / process | Anodised Finish |
| Typical application | Swimwear |
| Base material | Bamboo |
| Standard size | 240 gsm |
| Colour matching | 24 Pantone or lab-dip matched shades |
| MOQ | 500 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 15-55 days after approval |
| Compliance | GRS |
Material and finish options
- Genuine Leather — chosen where strength and wear resistance come first
- Recycled PET — the cost-effective default for volume programmes
- Ceramic — selected when the item is in skin contact and needs to test clean
- Glass — used when the finish has to hold a plating or coating
- TPU — the cost-effective default for volume programmes
Processes available on this item
- Anti-Pilling Finish
- Embossing
- Stone Washing
- PU Coating
- Laminating
- Bonding

Where it is used
The specification above is the one most often ordered for Swimwear. Related applications on the same base include jeans, baby clothing, blazers, uniforms, backpacks.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Photo report shared before the balance payment is due.
- Packed to your own carton ratio and barcode specification.
- Test reports issued against GRS with the shipment.
- Golden sample retained at the factory, second one held by the buyer.
FAQ
What are the payment and delivery terms?
Standard terms are a deposit with the order and the balance before shipment, under EXW / FOB / CIF / DDP as agreed.
How long does sampling take?
14 working days for the first sample, with 5 days per revision round. Plated or dyed-to-match items add a few days.
Can you match a physical sample?
Yes. Send the reference and we reverse engineer the specification, then produce a counter sample for approval before any bulk commitment.
What happens if a bulk lot fails inspection?
The lot is reworked or remade at our cost. Inspection reports are shared before the balance payment is due.
Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.




