Guipure Lace with Matte Black Coating for Sneakers
This guipure lace is supplied to a written specification so that reorders match the approved sample. The product spec is fixed at quotation stage — base material, the matte black coating surface, the 38 mm Width and the packing — and held on file, which is what keeps sneakers consistent across seasons instead of drifting with whatever the mill happens to have in stock.
The usual reason buyers come to us is not price. It is a trim that passed sampling but failed in-line because it was never cycle tested, or shrinkage that only showed up after the first wash. Both are preventable once the specification is written down before bulk starts.

Specification
| Product | Guipure Lace |
|---|---|
| Finish / process | Matte Black Coating |
| Typical application | Sneakers |
| Base material | Glass |
| Standard size | 38 mm Width |
| Colour matching | 12 Pantone or lab-dip matched shades |
| MOQ | 500 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 20-55 days after approval |
| Compliance | AATCC Test Methods |
Material and finish options
- Cotton — preferred when weight matters more than rigidity
- Ceramic — used when the finish has to hold a plating or coating
- Neoprene — the cost-effective default for volume programmes
- TPU — preferred when weight matters more than rigidity
- Polyester — selected when the item is in skin contact and needs to test clean
Processes available on this item
- Brushing
- Calendering
- Embossing
- Injection Moulding
- UV Protection Finishing
- Laser Cutting

Where it is used
The specification above is the one most often ordered for Sneakers. Related applications on the same base include backpacks, coats, bras, evening wear, yoga wear.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Photo report shared before the balance payment is due.
- Packed to your own carton ratio and barcode specification.
- Test reports issued against AATCC Test Methods with the shipment.
- Golden sample retained at the factory, second one held by the buyer.
FAQ
Can you handle our own artwork or tooling?
Yes. Artwork files or existing tooling can be used; we confirm tolerances in writing before the first production run.
How long does sampling take?
14 working days for the first sample, with 3 days per revision round. Plated or dyed-to-match items add a few days.
Can you match a physical sample?
Yes. Send the reference and we reverse engineer the specification, then produce a counter sample for approval before any bulk commitment.
Do you hold stock for reorders?
Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.
Share the programme details and we will propose two alternatives — one optimised for unit cost, one for lead time — and let you choose.




