Aglet with Sandblasted Finish for Underwear
This aglet is supplied to a written specification so that reorders match the approved sample. The product spec is fixed at quotation stage — base material, the sandblasted finish surface, the 38 mm Width and the packing — and held on file, which is what keeps underwear consistent across seasons instead of drifting with whatever the mill happens to have in stock.
The usual reason buyers come to us is not price. It is shrinkage that only showed up after the first wash, or a spec that lived in an email instead of a tech pack. Both are preventable once the specification is written down before bulk starts.

Specification
| Product | Aglet |
|---|---|
| Finish / process | Sandblasted Finish |
| Typical application | Underwear |
| Base material | Polyester |
| Standard size | 38 mm Width |
| Colour matching | 8 Pantone or lab-dip matched shades |
| MOQ | 1,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 25-40 days after approval |
| Compliance | ISO 9001 |
Material and finish options
- Brass — chosen where strength and wear resistance come first
- Rubber — selected when the item is in skin contact and needs to test clean
- Stainless Steel — chosen where strength and wear resistance come first
- POM Plastic — used when the finish has to hold a plating or coating
- Bamboo — chosen where strength and wear resistance come first
Processes available on this item
- Weft Knitting
- PU Coating
- Embossing
- Electroplating
- Bonding
- Laminating

Where it is used
The specification above is the one most often ordered for Underwear. Related applications on the same base include kidswear, coats, socks, scarves, blazers.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Photo report shared before the balance payment is due.
- Packed to your own carton ratio and barcode specification.
- Test reports issued against ISO 9001 with the shipment.
- Golden sample retained at the factory, second one held by the buyer.
FAQ
How long does sampling take?
10 working days for the first sample, with 5 days per revision round. Plated or dyed-to-match items add a few days.
Do you hold stock for reorders?
Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.
Can you handle our own artwork or tooling?
Yes. Artwork files or existing tooling can be used; we confirm tolerances in writing before the first production run.
Can you match a physical sample?
Yes. Send the reference and we reverse engineer the specification, then produce a counter sample for approval before any bulk commitment.
Send the reference sample or tech pack and we will come back with a costed specification, a sampling timetable and the compliance documents your market requires.



