Metallic Thread with Epoxy Doming for Underwear
This metallic thread is supplied to a written specification so that reorders match the approved sample. The product spec is fixed at quotation stage — base material, the epoxy doming surface, the 15 mm Width and the packing — and held on file, which is what keeps underwear consistent across seasons instead of drifting with whatever the mill happens to have in stock.
The usual reason buyers come to us is not price. It is lead time quoted without the plating or dyeing sub-process, or shade drift between the approved lab dip and the bulk lot. Both are preventable once the specification is written down before bulk starts.

Specification
| Product | Metallic Thread |
|---|---|
| Finish / process | Epoxy Doming |
| Typical application | Underwear |
| Base material | PU Leather |
| Standard size | 15 mm Width |
| Colour matching | 8 Pantone or lab-dip matched shades |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 25-55 days after approval |
| Compliance | REACH SVHC Screening |
Material and finish options
- Glass — the cost-effective default for volume programmes
- Nylon — preferred when weight matters more than rigidity
- TPU — selected when the item is in skin contact and needs to test clean
- Stainless Steel — chosen where strength and wear resistance come first
- Nickel Silver — the cost-effective default for volume programmes
Processes available on this item
- Water Repellent Finishing
- Anodising
- Embossing
- Sanforising
- Injection Moulding
- Stone Washing

Where it is used
The specification above is the one most often ordered for Underwear. Related applications on the same base include activewear, bridal gowns, down jackets, shirts, dresses.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Photo report shared before the balance payment is due.
- Packed to your own carton ratio and barcode specification.
- Test reports issued against REACH SVHC Screening with the shipment.
- Golden sample retained at the factory, second one held by the buyer.
FAQ
How long does sampling take?
7 working days for the first sample, with 5 days per revision round. Plated or dyed-to-match items add a few days.
What happens if a bulk lot fails inspection?
The lot is reworked or remade at our cost. Inspection reports are shared before the balance payment is due.
Which compliance documents do you provide?
REACH SVHC Screening documentation is issued with the shipment. Test reports can be ordered against any additional standard you nominate.
What is the minimum order quantity?
Standard MOQ is 500 per style per colour. Mixed colourways can be combined on the same spec if the base material is identical.
Send the reference sample or tech pack and we will come back with a costed specification, a sampling timetable and the compliance documents your market requires.




