Welcome to Arts & Crafts-oopcc.com official website!
Selvedge Denim Fabric with Yarn-Dyed Finish for Backpacks

Selvedge Denim Fabric with Yarn-Dyed Finish for Backpacks

Selvedge Denim Fabric with Yarn-Dyed Finish for BackpacksThis selvedge denim fabric is supplied to a written specification so that reorders match the approved sample. The fabric construction is fixed.

Contact Number:
Product Details

Selvedge Denim Fabric with Yarn-Dyed Finish for Backpacks

This selvedge denim fabric is supplied to a written specification so that reorders match the approved sample. The fabric construction is fixed at quotation stage — base material, the yarn-dyed finish surface, the 210 gsm and the packing — and held on file, which is what keeps backpacks consistent across seasons instead of drifting with whatever the mill happens to have in stock.

The usual reason buyers come to us is not price. It is an interlining that bubbled after the first press, or shade drift between the approved lab dip and the bulk lot. Both are preventable once the specification is written down before bulk starts.

Selvedge Denim Fabric Yarn-Dyed Finish

Specification

ProductSelvedge Denim Fabric
Finish / processYarn-Dyed Finish
Typical applicationBackpacks
Base materialRecycled PET
Standard size210 gsm
Colour matching16 Pantone or lab-dip matched shades
MOQ5,000 pieces per specification
Sampling14 working days, 3 days per revision
Bulk lead time20-40 days after approval
ComplianceJIS L Standards

Material and finish options

  • Glass — used when the finish has to hold a plating or coating
  • Aluminium — preferred when weight matters more than rigidity
  • Genuine Leather — selected when the item is in skin contact and needs to test clean
  • Rubber — chosen where strength and wear resistance come first
  • Zinc Alloy — used when the finish has to hold a plating or coating

Processes available on this item

  • Weft Knitting
  • Electroplating
  • Ultrasonic Welding
  • Sublimation Printing
  • Enamel Filling
  • Embossing

Selvedge Denim Fabric production

Where it is used

The specification above is the one most often ordered for Backpacks. Related applications on the same base include sneakers, activewear, evening wear, sportswear, blouses.

Quality and packing

  • In-line inspection with AQL 4.0 sampling on every lot.
  • Photo report shared before the balance payment is due.
  • Packed to your own carton ratio and barcode specification.
  • Test reports issued against JIS L Standards with the shipment.
  • Golden sample retained at the factory, second one held by the buyer.

FAQ

How long does sampling take?

14 working days for the first sample, with 3 days per revision round. Plated or dyed-to-match items add a few days.

What happens if a bulk lot fails inspection?

The lot is reworked or remade at our cost. Inspection reports are shared before the balance payment is due.

Which compliance documents do you provide?

JIS L Standards documentation is issued with the shipment. Test reports can be ordered against any additional standard you nominate.

Can you match a physical sample?

Yes. Send the reference and we reverse engineer the specification, then produce a counter sample for approval before any bulk commitment.

If you are comparing suppliers, send us the spec they quoted against. We will quote the same spec and show you where the difference sits.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top