Welcome to Arts & Crafts-oopcc.com official website!
Custom Zipper in Nylon (PA) with Rose Gold Plating for Denim and Workwear Programmes

Custom Zipper in Nylon (PA) with Rose Gold Plating for Denim and Workwear Programmes

Custom Zipper — Nylon (PA) with Rose Gold PlatingWe supply zipper to garment factories and brands, built in Nylon (PA) with rose gold plating for e-commerce and small-batch brands. On a trim like.

Contact Number:
Product Details

Custom Zipper — Nylon (PA) with Rose Gold Plating

We supply zipper to garment factories and brands, built in Nylon (PA) with rose gold plating for e-commerce and small-batch brands. On a trim like this the specification that decides the outcome is slider smoothness across the full length, tested by hand on bulk, so that is agreed in writing before bulk — not discovered when the first carton is opened on the line. Programmes start at 5000 pieces per style per finish.

The failures here are predictable: packing that arrives mixed and unusable on the line, or shade variation within one carton. We lock material, finish, dimension and tolerance before bulk, and prepare SNI or SIRIM documentation per destination so the shipment clears instead of sitting at port while your selling season passes.

custom zipper

Specification

ProductZipper
Gauge#5
Typewater-resistant zipper
Base materialNylon (PA)
Finish / processRose Gold Plating
Colour options24 Pantone-matched shades
Packingreel packed
MOQ5000 pieces per style per finish
Sampling7 working days, 5 days per revision
Bulk lead time25-40 days after approval
ComplianceSNI or SIRIM documentation per destination; OEKO-TEX Standard 100 for dyes and trims
Ship toJakarta or Port Klang (Asia-Pacific)

What buyers can customise

  • Antique Brass Plating — available on Nylon (PA), quoted per position and per colour.
  • Heat Transfer Printing — available on Nylon (PA), quoted per position and per colour.
  • Stamping — available on Nylon (PA), quoted per position and per colour.
  • Soft Enamel Fill — available on Nylon (PA), quoted per position and per colour.
  • Powder Coating — available on Nylon (PA), quoted per position and per colour.
  • Offset Printing — available on Nylon (PA), quoted per position and per colour.
  • Gold Plating — available on Nylon (PA), quoted per position and per colour.

zipper rose gold plating detail

How we produce it

  1. Drawing or reference sample review, with size and finish confirmed
  2. Material selection and a finish sample or strike-off
  3. Prototype made to the agreed gauge
  4. Fit and wash test on the actual garment fabric, then a pre-production sample
  5. Bulk run with rose gold plating applied under controlled settings
  6. In-line inspection, final AQL 2.5 inspection and packing to your ratio

Where it is used

  • Denim and workwear — hard-wearing finishes that survive industrial washing
  • Outerwear and tailoring — matched to the shell fabric so it drapes with the garment
  • Childrenswear and schoolwear — tested to the destination's safety standard
  • Bridal and eveningwear — small runs with hand-finished detail
  • Uniform and corporate programmes — repeatable spec held on file for reorders

zipper production

Packing, testing and delivery

Trims are packed to the ratio you specify — by size, by colour or by garment set — with barcodes applied where the line needs them. Test reports for OEKO-TEX Standard 100 for dyes and trims are prepared for the destination market. We ship to Jakarta or Port Klang with the commercial invoice, packing list and certificate of origin, and hold the approved reference so reorders reproduce the same material, the same finish and the same slider smoothness across the full length.

FAQ

Which compliance documents do you provide?

We prepare OEKO-TEX Standard 100 for dyes and trims and the supporting test reports for the destination market.

What is the minimum order?

Programmes start at 5000 pieces per style per finish. Mixed sizes are fine within one style.

Do you ship to our forwarder?

Yes. We deliver to your nominated forwarder or quote landed cost under the agreed Incoterm.

How long does sampling take?

A first sample takes 7 working days, and each revision about 5 days.

Start your zipper programme

Tell us the quantity, the target price and the delivery window — we will tell you what is realistic before you commit.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top