Case Study: Custom Fleece Fabric for a Medical Textile Buyer in Singapore
Source:Gold Cartilage Earrings /
Time:2026-09-18
Fleece Fabric for a Medical Textile Buyer in Singapore
A Medical Textile Buyer approached us with a fleece fabric requirement for the Singapore market. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive freight and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Reorders that quietly changed supplier and changed the hand feel
- A compliance document that arrived after the goods were already shipped
- Cartons packed to the factory ratio instead of the buyer's size ratio

What we specified
| Item | Fleece Fabric |
|---|---|
| Client type | A Medical Textile Buyer |
| Market | Singapore |
| Order volume | 100,000 pieces across 4 specifications |
| Base material | Silicone |
| Standard size | 280 gsm |
| Finish | Brushed Silver Finish |
| Sampling rounds | 3 |
| Delivery window | 6 weeks from PO to ex-factory |
| Compliance | BSCI |
How it was resolved
- We rebuilt the specification around Silicone and locked the tolerance before bulk.
- The finish was moved to UV Printing after strike-off tests showed better durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.

Result
- 100,000 pieces delivered inside the 6-week window.
- Unit cost held within 2.0% of the original quotation.
- Inspection-related rejection stayed under 1.5%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Lock the material standard before sampling. Once the base changes, every downstream approval has to be redone and the calendar slips.
Planning something similar?
Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.



