Case Study: Custom Silicone Gripper Tape for a Lingerie Specialist in Colombia
Source:Colored Glass Vase Set /
Time:2026-09-18
Silicone Gripper Tape for a Lingerie Specialist in Colombia
A Lingerie Specialist approached us with a silicone gripper tape requirement for the Colombia market. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive freight and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- MOQ that was quoted per colourway rather than per style
- Reorders that quietly changed supplier and changed the hand feel
- Shade drift between the approved lab dip and the bulk lot

What we specified
| Item | Silicone Gripper Tape |
|---|---|
| Client type | A Lingerie Specialist |
| Market | Colombia |
| Order volume | 2,000 pieces across 4 specifications |
| Base material | POM Plastic |
| Standard size | 10# Gauge |
| Finish | Rose Gold Plating |
| Sampling rounds | 3 |
| Delivery window | 4 weeks from PO to ex-factory |
| Compliance | California Prop 65 |
How it was resolved
- We rebuilt the specification around POM Plastic and locked the tolerance before bulk.
- The finish was moved to Yarn-Dyed Finish after strike-off tests showed better durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.

Result
- 2,000 pieces delivered inside the 4-week window.
- Unit cost held within 4.5% of the original quotation.
- Inspection-related rejection stayed under 0.5%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Approve a pre-production sample made from the actual bulk base material. Substitute material behaves differently in finishing.
Planning something similar?
Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.



