A Startup Apparel Label approached us with a two-way separating zipper requirement for the Saudi Arabia market. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive freight and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Elastic that lost recovery after three washes
- Lead time quoted without the plating or dyeing sub-process
- A zipper puller that broke under pull test at the warehouse

What we specified
| Item | Two-Way Separating Zipper |
|---|---|
| Client type | A Startup Apparel Label |
| Market | Saudi Arabia |
| Order volume | 5,000 pieces across 4 specifications |
| Base material | Acrylic |
| Standard size | 38 mm Width |
| Finish | Black Nickel Finish |
| Sampling rounds | 4 |
| Delivery window | 8 weeks from PO to ex-factory |
| Compliance | EN 71-3 |
How it was resolved
- We rebuilt the specification around Acrylic and locked the tolerance before bulk.
- The finish was moved to Brushed Silver Finish after strike-off tests showed better durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.

Result
- 5,000 pieces delivered inside the 8-week window.
- Unit cost held within 4.5% of the original quotation.
- Inspection-related rejection stayed under 1.5%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Keep one accountable owner on both sides. Most delays come from hand-offs, not from machines.
Planning something similar?
Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.