Case Study: Custom Georgette Fabric for a Promotional Product Agency in Saudi Arabia
Georgette Fabric for a Promotional Product Agency in Saudi Arabia
A Promotional Product Agency approached us with a georgette fabric requirement for the Saudi Arabia market. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive freight and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Shade drift between the approved lab dip and the bulk lot
- Cartons packed to the factory ratio instead of the buyer's size ratio
- Reorders that quietly changed supplier and changed the hand feel

What we specified
| Item | Georgette Fabric |
|---|---|
| Client type | A Promotional Product Agency |
| Market | Saudi Arabia |
| Order volume | 5,000 pieces across 6 specifications |
| Base material | TPU |
| Standard size | 400 gsm |
| Finish | Rainbow Iridescent Finish |
| Sampling rounds | 2 |
| Delivery window | 5 weeks from PO to ex-factory |
| Compliance | California Prop 65 |
How it was resolved
- We rebuilt the specification around TPU and locked the tolerance before bulk.
- The finish was moved to Piece-Dyed Finish after strike-off tests showed better durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.

Result
- 5,000 pieces delivered inside the 5-week window.
- Unit cost held within 4.5% of the original quotation.
- Inspection-related rejection stayed under 2.0%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Lock the material standard before sampling. Once the base changes, every downstream approval has to be redone and the calendar slips.
Planning something similar?
Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.



