Case Study: Custom Sequin Trim for a Bag and Luggage Maker in Spain
Source:Custom Dry Fountain /
Time:2026-09-18
Sequin Trim for a Bag and Luggage Maker in Spain
A Bag and Luggage Maker approached us with a sequin trim requirement for the Spain market. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive freight and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Elastic that lost recovery after three washes
- Reorders that quietly changed supplier and changed the hand feel
- MOQ that was quoted per colourway rather than per style

What we specified
| Item | Sequin Trim |
|---|---|
| Client type | A Bag and Luggage Maker |
| Market | Spain |
| Order volume | 10,000 pieces across 2 specifications |
| Base material | Bamboo |
| Standard size | 15 mm Width |
| Finish | Sandblasted Finish |
| Sampling rounds | 4 |
| Delivery window | 8 weeks from PO to ex-factory |
| Compliance | GB 18401 |
How it was resolved
- We rebuilt the specification around Bamboo and locked the tolerance before bulk.
- The finish was moved to Silicone Wash Finish after strike-off tests showed better durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.

Result
- 10,000 pieces delivered inside the 8-week window.
- Unit cost held within 3.0% of the original quotation.
- Inspection-related rejection stayed under 1.0%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Keep one accountable owner on both sides. Most delays come from hand-offs, not from machines.
Planning something similar?
Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.



