Case Study: Custom Crochet Lace for a Theatre Costume Workshop in India
Source:Handcrafted Wax Warmers /
Time:2026-09-18
Crochet Lace for a Theatre Costume Workshop in India
A Theatre Costume Workshop approached us with a crochet lace requirement for the India market. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive freight and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Cartons packed to the factory ratio instead of the buyer's size ratio
- A spec that lived in an email instead of a tech pack
- Shade drift between the approved lab dip and the bulk lot

What we specified
| Item | Crochet Lace |
|---|---|
| Client type | A Theatre Costume Workshop |
| Market | India |
| Order volume | 5,000 pieces across 6 specifications |
| Base material | Recycled PET |
| Standard size | 9 mm Width |
| Finish | Black Nickel Finish |
| Sampling rounds | 4 |
| Delivery window | 6 weeks from PO to ex-factory |
| Compliance | JIS L Standards |
How it was resolved
- We rebuilt the specification around Recycled PET and locked the tolerance before bulk.
- The finish was moved to Pearlescent Coating after strike-off tests showed better durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.

Result
- 5,000 pieces delivered inside the 6-week window.
- Unit cost held within 4.5% of the original quotation.
- Inspection-related rejection stayed under 2.0%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Fix the specification count early. Adding variants after production starts is the most expensive change a client can request.
Planning something similar?
Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.



