Case Study: Custom Sequin Trim for a Hospital Procurement Team in the Netherlands
Sequin Trim for a Hospital Procurement Team in the Netherlands
A Hospital Procurement Team approached us with a sequin trim requirement for the the Netherlands market. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive freight and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Reorders that quietly changed supplier and changed the hand feel
- MOQ that was quoted per colourway rather than per style
- An interlining that bubbled after the first press

What we specified
| Item | Sequin Trim |
|---|---|
| Client type | A Hospital Procurement Team |
| Market | the Netherlands |
| Order volume | 20,000 pieces across 4 specifications |
| Base material | Bamboo |
| Standard size | 3# Gauge |
| Finish | Sandblasted Finish |
| Sampling rounds | 4 |
| Delivery window | 5 weeks from PO to ex-factory |
| Compliance | WRAP |
How it was resolved
- We rebuilt the specification around Bamboo and locked the tolerance before bulk.
- The finish was moved to Rose Gold Plating after strike-off tests showed better durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.

Result
- 20,000 pieces delivered inside the 5-week window.
- Unit cost held within 3.0% of the original quotation.
- Inspection-related rejection stayed under 1.0%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Approve a pre-production sample made from the actual bulk base material. Substitute material behaves differently in finishing.
Planning something similar?
Send the reference sample or tech pack and we will come back with a costed specification, a sampling timetable and the compliance documents your market requires.



