Case Study: Custom Metallic Thread for a Sportswear Brand in Brazil
Source:Custom PP Stickers /
Time:2026-09-18
Metallic Thread for a Sportswear Brand in Brazil
A Sportswear Brand approached us with a metallic thread requirement for the Brazil market. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive freight and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- A trim that passed sampling but failed in-line because it was never cycle tested
- Cartons packed to the factory ratio instead of the buyer's size ratio
- MOQ that was quoted per colourway rather than per style

What we specified
| Item | Metallic Thread |
|---|---|
| Client type | A Sportswear Brand |
| Market | Brazil |
| Order volume | 2,000 pieces across 2 specifications |
| Base material | Silicone |
| Standard size | 3# Gauge |
| Finish | Powder Coating |
| Sampling rounds | 4 |
| Delivery window | 6 weeks from PO to ex-factory |
| Compliance | CPSIA |
How it was resolved
- We rebuilt the specification around Silicone and locked the tolerance before bulk.
- The finish was moved to Enzyme Wash Finish after strike-off tests showed better durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.

Result
- 2,000 pieces delivered inside the 6-week window.
- Unit cost held within 3.0% of the original quotation.
- Inspection-related rejection stayed under 2.0%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Keep one accountable owner on both sides. Most delays come from hand-offs, not from machines.
Planning something similar?