A Denim Manufacturer approached us with a faux fur fabric requirement for the Italy market. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive freight and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Shrinkage that only showed up after the first wash
- Shade drift between the approved lab dip and the bulk lot
- A zipper puller that broke under pull test at the warehouse

What we specified
| Item | Faux Fur Fabric |
|---|---|
| Client type | A Denim Manufacturer |
| Market | Italy |
| Order volume | 20,000 pieces across 6 specifications |
| Base material | Ceramic |
| Standard size | 180 gsm |
| Finish | Piece-Dyed Finish |
| Sampling rounds | 2 |
| Delivery window | 4 weeks from PO to ex-factory |
| Compliance | GB 18401 |
How it was resolved
- We rebuilt the specification around Ceramic and locked the tolerance before bulk.
- The finish was moved to Brushed Silver Finish after strike-off tests showed better durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.

Result
- 20,000 pieces delivered inside the 4-week window.
- Unit cost held within 1.5% of the original quotation.
- Inspection-related rejection stayed under 1.5%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Fix the specification count early. Adding variants after production starts is the most expensive change a client can request.