Welcome to Arts & Crafts-oopcc.com official website!

Case Study: Custom Wool Fabric for a Hospital Procurement Team in Argentina

Source:Coir Plant Mats / Time:2026-09-18

Wool Fabric for a Hospital Procurement Team in Argentina

A Hospital Procurement Team approached us with a wool fabric requirement for the Argentina market. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive freight and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.

The challenge

  • Reorders that quietly changed supplier and changed the hand feel
  • A spec that lived in an email instead of a tech pack
  • Cartons packed to the factory ratio instead of the buyer's size ratio

Wool Fabric case study

What we specified

ItemWool Fabric
Client typeA Hospital Procurement Team
MarketArgentina
Order volume50,000 pieces across 4 specifications
Base materialBrass
Standard size210 gsm
FinishUV Printing
Sampling rounds2
Delivery window10 weeks from PO to ex-factory
ComplianceJIS L Standards

How it was resolved

  1. We rebuilt the specification around Brass and locked the tolerance before bulk.
  2. The finish was moved to Rose Gold Plating after strike-off tests showed better durability.
  3. A pre-production sample was approved and retained as the golden reference.
  4. Production ran with in-line inspection and a mid-run photo report.
  5. Cartons were packed to the client's own barcode and ratio specification.

Wool Fabric production run

Result

  • 50,000 pieces delivered inside the 10-week window.
  • Unit cost held within 3.0% of the original quotation.
  • Inspection-related rejection stayed under 2.0%.
  • The specification is now on file, so reorders reproduce the approved sample.

What we would repeat

Lock the material standard before sampling. Once the base changes, every downstream approval has to be redone and the calendar slips.

Planning something similar?

Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top