Case Study: Custom PVC Patch for a Workwear Distributor in Israel
Source:Custom Dry Fountain /
Time:2026-09-18
PVC Patch for a Workwear Distributor in Israel
A Workwear Distributor approached us with a pvc patch requirement for the Israel market. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive freight and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- A compliance document that arrived after the goods were already shipped
- An interlining that bubbled after the first press
- Shrinkage that only showed up after the first wash

What we specified
| Item | PVC Patch |
|---|---|
| Client type | A Workwear Distributor |
| Market | Israel |
| Order volume | 10,000 pieces across 2 specifications |
| Base material | Stainless Steel |
| Standard size | 9 mm Width |
| Finish | Rose Gold Plating |
| Sampling rounds | 4 |
| Delivery window | 4 weeks from PO to ex-factory |
| Compliance | OEKO-TEX Standard 100 |
How it was resolved
- We rebuilt the specification around Stainless Steel and locked the tolerance before bulk.
- The finish was moved to Nickel-Free Electroplating after strike-off tests showed better durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.

Result
- 10,000 pieces delivered inside the 4-week window.
- Unit cost held within 3.0% of the original quotation.
- Inspection-related rejection stayed under 2.0%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Keep one accountable owner on both sides. Most delays come from hand-offs, not from machines.
Planning something similar?
Share the programme details and we will propose two alternatives — one optimised for unit cost, one for lead time — and let you choose.