Case Study: Custom Shoulder Pad for a Workwear Distributor in Indonesia
Source:Cultural Figurines Collectibles /
Time:2026-09-18
Shoulder Pad for a Workwear Distributor in Indonesia
A Workwear Distributor approached us with a shoulder pad requirement for the Indonesia market. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive freight and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- A trim that passed sampling but failed in-line because it was never cycle tested
- An interlining that bubbled after the first press
- Cartons packed to the factory ratio instead of the buyer's size ratio

What we specified
| Item | Shoulder Pad |
|---|---|
| Client type | A Workwear Distributor |
| Market | Indonesia |
| Order volume | 10,000 pieces across 6 specifications |
| Base material | Neoprene |
| Standard size | 3# Gauge |
| Finish | Brushed Silver Finish |
| Sampling rounds | 4 |
| Delivery window | 6 weeks from PO to ex-factory |
| Compliance | OEKO-TEX Standard 100 |
How it was resolved
- We rebuilt the specification around Neoprene and locked the tolerance before bulk.
- The finish was moved to Matte Black Coating after strike-off tests showed better durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.

Result
- 10,000 pieces delivered inside the 6-week window.
- Unit cost held within 3.0% of the original quotation.
- Inspection-related rejection stayed under 1.0%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Approve a pre-production sample made from the actual bulk base material. Substitute material behaves differently in finishing.