A Hotel Group approached us with a waterproof zipper requirement for the the Philippines market. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive freight and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Lead time quoted without the plating or dyeing sub-process
- A compliance document that arrived after the goods were already shipped
- Cartons packed to the factory ratio instead of the buyer's size ratio

What we specified
| Item | Waterproof Zipper |
|---|---|
| Client type | A Hotel Group |
| Market | the Philippines |
| Order volume | 100,000 pieces across 4 specifications |
| Base material | Wood |
| Standard size | 6 mm Width |
| Finish | Chrome Plating |
| Sampling rounds | 4 |
| Delivery window | 6 weeks from PO to ex-factory |
| Compliance | EN 71-3 |
How it was resolved
- We rebuilt the specification around Wood and locked the tolerance before bulk.
- The finish was moved to Mercerised Finish after strike-off tests showed better durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.

Result
- 100,000 pieces delivered inside the 6-week window.
- Unit cost held within 4.5% of the original quotation.
- Inspection-related rejection stayed under 0.5%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Keep one accountable owner on both sides. Most delays come from hand-offs, not from machines.
Planning something similar?
Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.