Case Study: Custom Tack Button for an Independent Boutique in Chile
Source:Matching Jewelry Gift Sets /
Time:2026-09-18
Tack Button for an Independent Boutique in Chile
An Independent Boutique approached us with a tack button requirement for the Chile market. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive freight and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- MOQ that was quoted per colourway rather than per style
- A trim that passed sampling but failed in-line because it was never cycle tested
- An interlining that bubbled after the first press

What we specified
| Item | Tack Button |
|---|---|
| Client type | An Independent Boutique |
| Market | Chile |
| Order volume | 20,000 pieces across 3 specifications |
| Base material | PU Leather |
| Standard size | 3# Gauge |
| Finish | Silicone Wash Finish |
| Sampling rounds | 4 |
| Delivery window | 10 weeks from PO to ex-factory |
| Compliance | REACH SVHC Screening |
How it was resolved
- We rebuilt the specification around PU Leather and locked the tolerance before bulk.
- The finish was moved to Anodised Finish after strike-off tests showed better durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.

Result
- 20,000 pieces delivered inside the 10-week window.
- Unit cost held within 4.5% of the original quotation.
- Inspection-related rejection stayed under 1.0%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Approve a pre-production sample made from the actual bulk base material. Substitute material behaves differently in finishing.
Planning something similar?
Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.