Case Study: Custom Printed Label for a Denim Manufacturer in Peru
Source:Custom Branded Soccer Balls /
Time:2026-09-18
Printed Label for a Denim Manufacturer in Peru
A Denim Manufacturer approached us with a printed label requirement for the Peru market. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive freight and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- A zipper puller that broke under pull test at the warehouse
- Cartons packed to the factory ratio instead of the buyer's size ratio
- An interlining that bubbled after the first press

What we specified
| Item | Printed Label |
|---|---|
| Client type | A Denim Manufacturer |
| Market | Peru |
| Order volume | 50,000 pieces across 6 specifications |
| Base material | Stainless Steel |
| Standard size | 6 mm Width |
| Finish | Anodised Finish |
| Sampling rounds | 3 |
| Delivery window | 6 weeks from PO to ex-factory |
| Compliance | Sedex SMETA |
How it was resolved
- We rebuilt the specification around Stainless Steel and locked the tolerance before bulk.
- The finish was moved to Soft-Touch Rubber Coating after strike-off tests showed better durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.

Result
- 50,000 pieces delivered inside the 6-week window.
- Unit cost held within 4.5% of the original quotation.
- Inspection-related rejection stayed under 1.5%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Lock the material standard before sampling. Once the base changes, every downstream approval has to be redone and the calendar slips.