Case Study: Custom Boning Tape for a Denim Manufacturer in Indonesia
Source:Gold Locket Pendants /
Time:2026-09-18
Boning Tape for a Denim Manufacturer in Indonesia
A Denim Manufacturer approached us with a boning tape requirement for the Indonesia market. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive freight and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Shrinkage that only showed up after the first wash
- An interlining that bubbled after the first press
- A trim that passed sampling but failed in-line because it was never cycle tested

What we specified
| Item | Boning Tape |
|---|---|
| Client type | A Denim Manufacturer |
| Market | Indonesia |
| Order volume | 100,000 pieces across 2 specifications |
| Base material | Ceramic |
| Standard size | 38 mm Width |
| Finish | Mercerised Finish |
| Sampling rounds | 4 |
| Delivery window | 8 weeks from PO to ex-factory |
| Compliance | CPSIA |
How it was resolved
- We rebuilt the specification around Ceramic and locked the tolerance before bulk.
- The finish was moved to Enzyme Wash Finish after strike-off tests showed better durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.

Result
- 100,000 pieces delivered inside the 8-week window.
- Unit cost held within 4.5% of the original quotation.
- Inspection-related rejection stayed under 2.0%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Keep one accountable owner on both sides. Most delays come from hand-offs, not from machines.