Shank Button Sourcing Program for E-commerce Sellers
Shank Button Programme for E-commerce Sellers
This programme covers the full path from a shank button requirement to a repeatable bulk supply for e-commerce sellers. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 50 mm Width, the finish and the packing, and we hold that specification so every reorder matches the last one.
The most common failure in shank button sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

What the programme covers
- Specification build from your tech pack or a physical reference sample
- Base material and finish options with costed alternatives
- Sampling, testing and approval against California Prop 65
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
Recommended specifications
- Silicone — best balance of cost, availability and test performance
- Polyester — chosen when the item has to survive repeated laundering
- Neoprene — chosen when the item has to survive repeated laundering
- Brass — best balance of cost, availability and test performance

Programme parameters
| Item | Shank Button |
|---|---|
| Target sector | E-commerce Sellers |
| Standard size | 50 mm Width |
| Finish options | Epoxy Doming, Mercerised Finish, Brushed Silver Finish |
| Processes | Screen Printing, Mercerising, Embossing |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 20-40 days |
| Compliance | California Prop 65 |
| Delivery terms | EXW / FOB / CIF / DDP |
Why buyers choose this route
- Plating and dyeing sub-processes planned into the quoted lead time
- Trim and fabric sourced from audited mills with test reports on file
- AQL inspection on every bulk lot with photo reporting before balance payment
- Written specification held on file, so every reorder reproduces the approved sample
- One accountable owner from sampling through to ex-factory
How the programme runs
- Discovery call: quantity, target price, delivery window and compliance needs
- Material and finish proposal with costed alternatives
- Counter sample built from your tech pack or reference sample
- Approval, testing and pre-production sign-off
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
FAQ
What are the payment and delivery terms?
Standard terms are a deposit with the order and the balance before shipment, under EXW / FOB / CIF / DDP as agreed.
What happens if a bulk lot fails inspection?
The lot is reworked or remade at our cost. Inspection reports are shared before the balance payment is due.
Do you hold stock for reorders?
Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.
Can you handle our own artwork or tooling?
Yes. Artwork files or existing tooling can be used; we confirm tolerances in writing before the first production run.
Send the reference sample or tech pack and we will come back with a costed specification, a sampling timetable and the compliance documents your market requires.



