Recycled Cotton Fabric Sourcing Program for Costume and Theatre
Recycled Cotton Fabric Programme for Costume and Theatre
This programme covers the full path from a recycled cotton fabric requirement to a repeatable bulk supply for costume and theatre. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 450 gsm, the finish and the packing, and we hold that specification so every reorder matches the last one.
The most common failure in recycled cotton fabric sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

What the programme covers
- Specification build from your tech pack or a physical reference sample
- Base material and finish options with costed alternatives
- Sampling, testing and approval against OEKO-TEX Standard 100
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
Recommended specifications
- Zinc Alloy — best balance of cost, availability and test performance
- Iron — used when strength and abrasion resistance come first
- Wood — selected for colour depth and finish stability
- ABS Resin — used when strength and abrasion resistance come first

Programme parameters
| Item | Recycled Cotton Fabric |
|---|---|
| Target sector | Costume and Theatre |
| Standard size | 450 gsm |
| Finish options | Yarn-Dyed Finish, Enzyme Wash Finish, Anodised Finish |
| Processes | Electroplating, Anti-Bacterial Finishing, UV Protection Finishing |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 25-55 days |
| Compliance | OEKO-TEX Standard 100 |
| Delivery terms | EXW / FOB / CIF / DDP |
Why buyers choose this route
- Golden sample retained at the factory and a second one held by the buyer
- Compliance documentation issued with the shipment, not after it
- Plating and dyeing sub-processes planned into the quoted lead time
- Trim and fabric sourced from audited mills with test reports on file
- Consolidated shipping with documented carton ratios
How the programme runs
- Discovery call: quantity, target price, delivery window and compliance needs
- Material and finish proposal with costed alternatives
- Counter sample built from your tech pack or reference sample
- Approval, testing and pre-production sign-off
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
FAQ
Can you match a physical sample?
Yes. Send the reference and we reverse engineer the specification, then produce a counter sample for approval before any bulk commitment.
Which compliance documents do you provide?
OEKO-TEX Standard 100 documentation is issued with the shipment. Test reports can be ordered against any additional standard you nominate.
Can you handle our own artwork or tooling?
Yes. Artwork files or existing tooling can be used; we confirm tolerances in writing before the first production run.
What happens if a bulk lot fails inspection?
The lot is reworked or remade at our cost. Inspection reports are shared before the balance payment is due.
If you are comparing suppliers, send us the spec they quoted against. We will quote the same spec and show you where the difference sits.



