Magnetic Snap Sourcing Program for Hospitals and Clinics
Magnetic Snap Programme for Hospitals and Clinics
This programme covers the full path from a magnetic snap requirement to a repeatable bulk supply for hospitals and clinics. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 25 mm Width, the finish and the packing, and we hold that specification so every reorder matches the last one.
The most common failure in magnetic snap sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

What the programme covers
- Specification build from your tech pack or a physical reference sample
- Base material and finish options with costed alternatives
- Sampling, testing and approval against GRS
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
Recommended specifications
- Bamboo — best balance of cost, availability and test performance
- Nickel Silver — used when strength and abrasion resistance come first
- Aluminium — selected for colour depth and finish stability
- Stainless Steel — used when strength and abrasion resistance come first

Programme parameters
| Item | Magnetic Snap |
|---|---|
| Target sector | Hospitals and Clinics |
| Standard size | 25 mm Width |
| Finish options | Pearlescent Coating, Black Nickel Finish, Sandblasted Finish |
| Processes | Ultrasonic Welding, Laminating, Calendering |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 25-40 days |
| Compliance | GRS |
| Delivery terms | EXW / FOB / CIF / DDP |
Why buyers choose this route
- MOQ quoted per style per colourway, stated before sampling starts
- Compliance documentation issued with the shipment, not after it
- Consolidated shipping with documented carton ratios
- Plating and dyeing sub-processes planned into the quoted lead time
- Costed alternatives shown at quotation so the trade-off is visible
How the programme runs
- Discovery call: quantity, target price, delivery window and compliance needs
- Material and finish proposal with costed alternatives
- Counter sample built from your tech pack or reference sample
- Approval, testing and pre-production sign-off
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
FAQ
What happens if a bulk lot fails inspection?
The lot is reworked or remade at our cost. Inspection reports are shared before the balance payment is due.
How long does sampling take?
10 working days for the first sample, with 5 days per revision round. Plated or dyed-to-match items add a few days.
Do you hold stock for reorders?
Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.
What are the payment and delivery terms?
Standard terms are a deposit with the order and the balance before shipment, under EXW / FOB / CIF / DDP as agreed.
If you are comparing suppliers, send us the spec they quoted against. We will quote the same spec and show you where the difference sits.



