Corduroy Fabric Sourcing Program for Sock and Hosiery Makers
Corduroy Fabric Programme for Sock and Hosiery Makers
This programme covers the full path from a corduroy fabric requirement to a repeatable bulk supply for sock and hosiery makers. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 80 gsm, the finish and the packing, and we hold that specification so every reorder matches the last one.
The most common failure in corduroy fabric sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

What the programme covers
- Specification build from your tech pack or a physical reference sample
- Base material and finish options with costed alternatives
- Sampling, testing and approval against EN 71-3
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
Recommended specifications
- Wood — used when strength and abrasion resistance come first
- Nickel Silver — selected for colour depth and finish stability
- Stainless Steel — used when strength and abrasion resistance come first
- Ceramic — selected for colour depth and finish stability

Programme parameters
| Item | Corduroy Fabric |
|---|---|
| Target sector | Sock and Hosiery Makers |
| Standard size | 80 gsm |
| Finish options | Mercerised Finish, Soft-Touch Rubber Coating, Black Nickel Finish |
| Processes | Ultrasonic Welding, Heat Setting, Piece Dyeing |
| MOQ | 500 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 20-55 days |
| Compliance | EN 71-3 |
| Delivery terms | EXW / FOB / CIF / DDP |
Why buyers choose this route
- Costed alternatives shown at quotation so the trade-off is visible
- One accountable owner from sampling through to ex-factory
- Written specification held on file, so every reorder reproduces the approved sample
- Golden sample retained at the factory and a second one held by the buyer
- Compliance documentation issued with the shipment, not after it
How the programme runs
- Discovery call: quantity, target price, delivery window and compliance needs
- Material and finish proposal with costed alternatives
- Counter sample built from your tech pack or reference sample
- Approval, testing and pre-production sign-off
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
FAQ
Do you hold stock for reorders?
Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.
What are the payment and delivery terms?
Standard terms are a deposit with the order and the balance before shipment, under EXW / FOB / CIF / DDP as agreed.
Which compliance documents do you provide?
EN 71-3 documentation is issued with the shipment. Test reports can be ordered against any additional standard you nominate.
How long does sampling take?
10 working days for the first sample, with 5 days per revision round. Plated or dyed-to-match items add a few days.
Send the reference sample or tech pack and we will come back with a costed specification, a sampling timetable and the compliance documents your market requires.



