Welcome to Arts & Crafts-oopcc.com official website!

Velvet Fabric Sourcing Program for Cycling Apparel Brands: Gloves

Source:Solution / Time:2026-09-18

Velvet Fabric Programme for Cycling Apparel Brands: Gloves

This programme covers the full path from a velvet fabric requirement to a repeatable bulk supply for cycling apparel brands. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 400 gsm, the finish and the packing, and we hold that specification so every reorder matches the last one. It is built around gloves, which is where most of the specification detail sits.

The most common failure in velvet fabric sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

Velvet Fabric for Cycling Apparel Brands

What the programme covers

  • Specification build from your tech pack or a physical reference sample
  • Base material and finish options with costed alternatives
  • Sampling, testing and approval against ISO 14001
  • Bulk production with in-line inspection and photo reporting
  • Packing, documentation and shipment under the agreed Incoterm

Recommended specifications

  • Aluminium — selected for colour depth and finish stability
  • Cotton — used when strength and abrasion resistance come first
  • Iron — selected for colour depth and finish stability
  • Polyester — chosen when the item has to survive repeated laundering

Velvet Fabric specification

Programme parameters

ItemVelvet Fabric
Target sectorCycling Apparel Brands
Target applicationGloves
Standard size400 gsm
Finish optionsRose Gold Plating, Yarn-Dyed Finish, Sandblasted Finish
ProcessesScreen Printing, Metal Stamping, Enamel Filling
MOQ500 pieces per specification
Sampling7 working days, 3 days per revision
Bulk lead time20-55 days
ComplianceISO 14001
Delivery termsEXW / FOB / CIF / DDP

Why buyers choose this route

  • Consolidated shipping with documented carton ratios
  • Golden sample retained at the factory and a second one held by the buyer
  • Costed alternatives shown at quotation so the trade-off is visible
  • Trim and fabric sourced from audited mills with test reports on file
  • Written specification held on file, so every reorder reproduces the approved sample

How the programme runs

  1. Discovery call: quantity, target price, delivery window and compliance needs
  2. Material and finish proposal with costed alternatives
  3. Counter sample built from your tech pack or reference sample
  4. Approval, testing and pre-production sign-off
  5. Bulk production with in-line inspection and photo reporting
  6. Packing, documentation and shipment under the agreed Incoterm

FAQ

How long does sampling take?

7 working days for the first sample, with 3 days per revision round. Plated or dyed-to-match items add a few days.

Do you hold stock for reorders?

Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.

What happens if a bulk lot fails inspection?

The lot is reworked or remade at our cost. Inspection reports are shared before the balance payment is due.

Can you handle our own artwork or tooling?

Yes. Artwork files or existing tooling can be used; we confirm tolerances in writing before the first production run.

Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top