PU Coated Fabric Sourcing Program for Lingerie Brands: Upholstery
PU Coated Fabric Programme for Lingerie Brands: Upholstery
This programme covers the full path from a pu coated fabric requirement to a repeatable bulk supply for lingerie brands. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 110 gsm, the finish and the packing, and we hold that specification so every reorder matches the last one. It is built around upholstery, which is where most of the specification detail sits.
The most common failure in pu coated fabric sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

What the programme covers
- Specification build from your tech pack or a physical reference sample
- Base material and finish options with costed alternatives
- Sampling, testing and approval against AATCC Test Methods
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
Recommended specifications
- Nylon — chosen when the item has to survive repeated laundering
- Glass — best balance of cost, availability and test performance
- Cotton — selected for colour depth and finish stability
- ABS Resin — best balance of cost, availability and test performance

Programme parameters
| Item | PU Coated Fabric |
|---|---|
| Target sector | Lingerie Brands |
| Target application | Upholstery |
| Standard size | 110 gsm |
| Finish options | Nickel-Free Electroplating, Enzyme Wash Finish, UV Printing |
| Processes | Singeing, UV Protection Finishing, Epoxy Coating |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 15-40 days |
| Compliance | AATCC Test Methods |
| Delivery terms | EXW / FOB / CIF / DDP |
Why buyers choose this route
- Consolidated shipping with documented carton ratios
- Compliance documentation issued with the shipment, not after it
- MOQ quoted per style per colourway, stated before sampling starts
- Golden sample retained at the factory and a second one held by the buyer
- Costed alternatives shown at quotation so the trade-off is visible
How the programme runs
- Discovery call: quantity, target price, delivery window and compliance needs
- Material and finish proposal with costed alternatives
- Counter sample built from your tech pack or reference sample
- Approval, testing and pre-production sign-off
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
FAQ
Can you match a physical sample?
Yes. Send the reference and we reverse engineer the specification, then produce a counter sample for approval before any bulk commitment.
Can you handle our own artwork or tooling?
Yes. Artwork files or existing tooling can be used; we confirm tolerances in writing before the first production run.
What are the payment and delivery terms?
Standard terms are a deposit with the order and the balance before shipment, under EXW / FOB / CIF / DDP as agreed.
How long does sampling take?
10 working days for the first sample, with 3 days per revision round. Plated or dyed-to-match items add a few days.
Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.