Boiled Wool Fabric Sourcing Program for Footwear Manufacturers: Trousers
Boiled Wool Fabric Programme for Footwear Manufacturers: Trousers
This programme covers the full path from a boiled wool fabric requirement to a repeatable bulk supply for footwear manufacturers. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 210 gsm, the finish and the packing, and we hold that specification so every reorder matches the last one. It is built around trousers, which is where most of the specification detail sits.
The most common failure in boiled wool fabric sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

What the programme covers
- Specification build from your tech pack or a physical reference sample
- Base material and finish options with costed alternatives
- Sampling, testing and approval against GB 18401
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
Recommended specifications
- Zinc Alloy — used when strength and abrasion resistance come first
- Nylon — chosen when the item has to survive repeated laundering
- Brass — selected for colour depth and finish stability
- TPU — used when strength and abrasion resistance come first

Programme parameters
| Item | Boiled Wool Fabric |
|---|---|
| Target sector | Footwear Manufacturers |
| Target application | Trousers |
| Standard size | 210 gsm |
| Finish options | Laser Engraved Finish, Enzyme Wash Finish, Chrome Plating |
| Processes | Bonding, Laminating, Mercerising |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 15-55 days |
| Compliance | GB 18401 |
| Delivery terms | EXW / FOB / CIF / DDP |
Why buyers choose this route
- Plating and dyeing sub-processes planned into the quoted lead time
- Compliance documentation issued with the shipment, not after it
- Trim and fabric sourced from audited mills with test reports on file
- Costed alternatives shown at quotation so the trade-off is visible
- Golden sample retained at the factory and a second one held by the buyer
How the programme runs
- Discovery call: quantity, target price, delivery window and compliance needs
- Material and finish proposal with costed alternatives
- Counter sample built from your tech pack or reference sample
- Approval, testing and pre-production sign-off
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
FAQ
Do you hold stock for reorders?
Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.
Can you handle our own artwork or tooling?
Yes. Artwork files or existing tooling can be used; we confirm tolerances in writing before the first production run.
How long does sampling take?
14 working days for the first sample, with 3 days per revision round. Plated or dyed-to-match items add a few days.
What is the minimum order quantity?
Standard MOQ is 3000 per style per colour. Mixed colourways can be combined on the same spec if the base material is identical.
Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.