Bra Underwire Sourcing Program for Military and Police Supply: Upholstery
Bra Underwire Programme for Military and Police Supply: Upholstery
This programme covers the full path from a bra underwire requirement to a repeatable bulk supply for military and police supply. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 9 mm Width, the finish and the packing, and we hold that specification so every reorder matches the last one. It is built around upholstery, which is where most of the specification detail sits.
The most common failure in bra underwire sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

What the programme covers
- Specification build from your tech pack or a physical reference sample
- Base material and finish options with costed alternatives
- Sampling, testing and approval against California Prop 65
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
Recommended specifications
- POM Plastic — best balance of cost, availability and test performance
- TPU — used when strength and abrasion resistance come first
- Polyester — chosen when the item has to survive repeated laundering
- Recycled PET — used when strength and abrasion resistance come first

Programme parameters
| Item | Bra Underwire |
|---|---|
| Target sector | Military and Police Supply |
| Target application | Upholstery |
| Standard size | 9 mm Width |
| Finish options | Epoxy Doming, Gunmetal Finish, Glossy Enamel Coating |
| Processes | Moisture Wicking Finishing, Flame Retardant Finishing, Mercerising |
| MOQ | 500 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 15-55 days |
| Compliance | California Prop 65 |
| Delivery terms | EXW / FOB / CIF / DDP |
Why buyers choose this route
- Compliance documentation issued with the shipment, not after it
- MOQ quoted per style per colourway, stated before sampling starts
- Golden sample retained at the factory and a second one held by the buyer
- One accountable owner from sampling through to ex-factory
- Trim and fabric sourced from audited mills with test reports on file
How the programme runs
- Discovery call: quantity, target price, delivery window and compliance needs
- Material and finish proposal with costed alternatives
- Counter sample built from your tech pack or reference sample
- Approval, testing and pre-production sign-off
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
FAQ
Which compliance documents do you provide?
California Prop 65 documentation is issued with the shipment. Test reports can be ordered against any additional standard you nominate.
Do you hold stock for reorders?
Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.
Can you handle our own artwork or tooling?
Yes. Artwork files or existing tooling can be used; we confirm tolerances in writing before the first production run.
What are the payment and delivery terms?
Standard terms are a deposit with the order and the balance before shipment, under EXW / FOB / CIF / DDP as agreed.
Send the reference sample or tech pack and we will come back with a costed specification, a sampling timetable and the compliance documents your market requires.