Welcome to Arts & Crafts-oopcc.com official website!

Zipper Slider Sourcing Program for Bag and Luggage Makers: Sneakers

Source:Solution / Time:2026-09-18

Zipper Slider Programme for Bag and Luggage Makers: Sneakers

This programme covers the full path from a zipper slider requirement to a repeatable bulk supply for bag and luggage makers. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 10# Gauge, the finish and the packing, and we hold that specification so every reorder matches the last one. It is built around sneakers, which is where most of the specification detail sits.

The most common failure in zipper slider sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

Zipper Slider for Bag and Luggage Makers

What the programme covers

  • Specification build from your tech pack or a physical reference sample
  • Base material and finish options with costed alternatives
  • Sampling, testing and approval against ISO 9001
  • Bulk production with in-line inspection and photo reporting
  • Packing, documentation and shipment under the agreed Incoterm

Recommended specifications

  • POM Plastic — chosen when the item has to survive repeated laundering
  • Copper — chosen when the item has to survive repeated laundering
  • Iron — used when strength and abrasion resistance come first
  • Stainless Steel — chosen when the item has to survive repeated laundering

Zipper Slider specification

Programme parameters

ItemZipper Slider
Target sectorBag and Luggage Makers
Target applicationSneakers
Standard size10# Gauge
Finish optionsPowder Coating, Antique Brass Plating, Sandblasted Finish
ProcessesEmbossing, Anti-Static Finishing, Moisture Wicking Finishing
MOQ1,000 pieces per specification
Sampling14 working days, 3 days per revision
Bulk lead time25-55 days
ComplianceISO 9001
Delivery termsEXW / FOB / CIF / DDP

Why buyers choose this route

  • MOQ quoted per style per colourway, stated before sampling starts
  • Consolidated shipping with documented carton ratios
  • Trim and fabric sourced from audited mills with test reports on file
  • Golden sample retained at the factory and a second one held by the buyer
  • Plating and dyeing sub-processes planned into the quoted lead time

How the programme runs

  1. Discovery call: quantity, target price, delivery window and compliance needs
  2. Material and finish proposal with costed alternatives
  3. Counter sample built from your tech pack or reference sample
  4. Approval, testing and pre-production sign-off
  5. Bulk production with in-line inspection and photo reporting
  6. Packing, documentation and shipment under the agreed Incoterm

FAQ

What are the payment and delivery terms?

Standard terms are a deposit with the order and the balance before shipment, under EXW / FOB / CIF / DDP as agreed.

What happens if a bulk lot fails inspection?

The lot is reworked or remade at our cost. Inspection reports are shared before the balance payment is due.

Do you hold stock for reorders?

Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.

Can you match a physical sample?

Yes. Send the reference and we reverse engineer the specification, then produce a counter sample for approval before any bulk commitment.

Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top