Iron-On Patch Sourcing Program for Sock and Hosiery Makers: Bedding Sets
Iron-On Patch Programme for Sock and Hosiery Makers: Bedding Sets
This programme covers the full path from a iron-on patch requirement to a repeatable bulk supply for sock and hosiery makers. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 20 mm Width, the finish and the packing, and we hold that specification so every reorder matches the last one. It is built around bedding sets, which is where most of the specification detail sits.
The most common failure in iron-on patch sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

What the programme covers
- Specification build from your tech pack or a physical reference sample
- Base material and finish options with costed alternatives
- Sampling, testing and approval against BSCI
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
Recommended specifications
- Zinc Alloy — chosen when the item has to survive repeated laundering
- Wood — used when strength and abrasion resistance come first
- Acrylic — selected for colour depth and finish stability
- POM Plastic — used when strength and abrasion resistance come first

Programme parameters
| Item | Iron-On Patch |
|---|---|
| Target sector | Sock and Hosiery Makers |
| Target application | Bedding Sets |
| Standard size | 20 mm Width |
| Finish options | Black Nickel Finish, Glossy Enamel Coating, Sandblasted Finish |
| Processes | Warp Knitting, Die Casting, Mercerising |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 25-30 days |
| Compliance | BSCI |
| Delivery terms | EXW / FOB / CIF / DDP |
Why buyers choose this route
- Costed alternatives shown at quotation so the trade-off is visible
- Compliance documentation issued with the shipment, not after it
- Plating and dyeing sub-processes planned into the quoted lead time
- AQL inspection on every bulk lot with photo reporting before balance payment
- Consolidated shipping with documented carton ratios
How the programme runs
- Discovery call: quantity, target price, delivery window and compliance needs
- Material and finish proposal with costed alternatives
- Counter sample built from your tech pack or reference sample
- Approval, testing and pre-production sign-off
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
FAQ
What is the minimum order quantity?
Standard MOQ is 3000 per style per colour. Mixed colourways can be combined on the same spec if the base material is identical.
Do you hold stock for reorders?
Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.
What happens if a bulk lot fails inspection?
The lot is reworked or remade at our cost. Inspection reports are shared before the balance payment is due.
How long does sampling take?
10 working days for the first sample, with 3 days per revision round. Plated or dyed-to-match items add a few days.
Send the reference sample or tech pack and we will come back with a costed specification, a sampling timetable and the compliance documents your market requires.



