Anti-Static Fabric Sourcing Program for PPE Distributors: Jackets
Anti-Static Fabric Programme for PPE Distributors: Jackets
This programme covers the full path from a anti-static fabric requirement to a repeatable bulk supply for ppe distributors. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 280 gsm, the finish and the packing, and we hold that specification so every reorder matches the last one. It is built around jackets, which is where most of the specification detail sits.
The most common failure in anti-static fabric sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

What the programme covers
- Specification build from your tech pack or a physical reference sample
- Base material and finish options with costed alternatives
- Sampling, testing and approval against California Prop 65
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
Recommended specifications
- Acrylic — chosen when the item has to survive repeated laundering
- Nylon — chosen when the item has to survive repeated laundering
- Copper — chosen when the item has to survive repeated laundering
- Polyester — best balance of cost, availability and test performance

Programme parameters
| Item | Anti-Static Fabric |
|---|---|
| Target sector | PPE Distributors |
| Target application | Jackets |
| Standard size | 280 gsm |
| Finish options | Antique Copper Finish, Rainbow Iridescent Finish, Anodised Finish |
| Processes | Moisture Wicking Finishing, Warp Knitting, Anti-Static Finishing |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 20-30 days |
| Compliance | California Prop 65 |
| Delivery terms | EXW / FOB / CIF / DDP |
Why buyers choose this route
- AQL inspection on every bulk lot with photo reporting before balance payment
- One accountable owner from sampling through to ex-factory
- Written specification held on file, so every reorder reproduces the approved sample
- Consolidated shipping with documented carton ratios
- Compliance documentation issued with the shipment, not after it
How the programme runs
- Discovery call: quantity, target price, delivery window and compliance needs
- Material and finish proposal with costed alternatives
- Counter sample built from your tech pack or reference sample
- Approval, testing and pre-production sign-off
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
FAQ
What happens if a bulk lot fails inspection?
The lot is reworked or remade at our cost. Inspection reports are shared before the balance payment is due.
Can you handle our own artwork or tooling?
Yes. Artwork files or existing tooling can be used; we confirm tolerances in writing before the first production run.
Which compliance documents do you provide?
California Prop 65 documentation is issued with the shipment. Test reports can be ordered against any additional standard you nominate.
How long does sampling take?
14 working days for the first sample, with 3 days per revision round. Plated or dyed-to-match items add a few days.
Share the programme details and we will propose two alternatives — one optimised for unit cost, one for lead time — and let you choose.



