Velvet Fabric Sourcing Program for Ski and Snowboard Brands: Trousers
Velvet Fabric Programme for Ski and Snowboard Brands: Trousers
This programme covers the full path from a velvet fabric requirement to a repeatable bulk supply for ski and snowboard brands. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 280 gsm, the finish and the packing, and we hold that specification so every reorder matches the last one. It is built around trousers, which is where most of the specification detail sits.
The most common failure in velvet fabric sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

What the programme covers
- Specification build from your tech pack or a physical reference sample
- Base material and finish options with costed alternatives
- Sampling, testing and approval against ISO 12947 Abrasion Resistance
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
Recommended specifications
- PU Leather — selected for colour depth and finish stability
- ABS Resin — chosen when the item has to survive repeated laundering
- POM Plastic — best balance of cost, availability and test performance
- Ceramic — best balance of cost, availability and test performance

Programme parameters
| Item | Velvet Fabric |
|---|---|
| Target sector | Ski and Snowboard Brands |
| Target application | Trousers |
| Standard size | 280 gsm |
| Finish options | Sandblasted Finish, Gunmetal Finish, Enzyme Wash Finish |
| Processes | Sublimation Printing, Metal Stamping, Anti-Pilling Finish |
| MOQ | 2,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 25-30 days |
| Compliance | ISO 12947 Abrasion Resistance |
| Delivery terms | EXW / FOB / CIF / DDP |
Why buyers choose this route
- AQL inspection on every bulk lot with photo reporting before balance payment
- Consolidated shipping with documented carton ratios
- Costed alternatives shown at quotation so the trade-off is visible
- Plating and dyeing sub-processes planned into the quoted lead time
- MOQ quoted per style per colourway, stated before sampling starts
How the programme runs
- Discovery call: quantity, target price, delivery window and compliance needs
- Material and finish proposal with costed alternatives
- Counter sample built from your tech pack or reference sample
- Approval, testing and pre-production sign-off
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
FAQ
Which compliance documents do you provide?
ISO 12947 Abrasion Resistance documentation is issued with the shipment. Test reports can be ordered against any additional standard you nominate.
Can you match a physical sample?
Yes. Send the reference and we reverse engineer the specification, then produce a counter sample for approval before any bulk commitment.
What are the payment and delivery terms?
Standard terms are a deposit with the order and the balance before shipment, under EXW / FOB / CIF / DDP as agreed.
What happens if a bulk lot fails inspection?
The lot is reworked or remade at our cost. Inspection reports are shared before the balance payment is due.
Share the programme details and we will propose two alternatives — one optimised for unit cost, one for lead time — and let you choose.



