Welcome to Arts & Crafts-oopcc.com official website!

Pearl Button Sourcing Program for Costume and Theatre: Jeans

Source:Solution / Time:2026-09-18

Pearl Button Programme for Costume and Theatre: Jeans

This programme covers the full path from a pearl button requirement to a repeatable bulk supply for costume and theatre. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 50 mm Width, the finish and the packing, and we hold that specification so every reorder matches the last one. It is built around jeans, which is where most of the specification detail sits.

The most common failure in pearl button sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

Pearl Button for Costume and Theatre

What the programme covers

  • Specification build from your tech pack or a physical reference sample
  • Base material and finish options with costed alternatives
  • Sampling, testing and approval against GB 18401
  • Bulk production with in-line inspection and photo reporting
  • Packing, documentation and shipment under the agreed Incoterm

Recommended specifications

  • Glass — best balance of cost, availability and test performance
  • Ceramic — selected for colour depth and finish stability
  • Cotton — used when strength and abrasion resistance come first
  • Neoprene — best balance of cost, availability and test performance

Pearl Button specification

Programme parameters

ItemPearl Button
Target sectorCostume and Theatre
Target applicationJeans
Standard size50 mm Width
Finish optionsEpoxy Doming, Black Nickel Finish, Mercerised Finish
ProcessesEmbossing, Anti-Static Finishing, Anodising
MOQ3,000 pieces per specification
Sampling7 working days, 3 days per revision
Bulk lead time20-40 days
ComplianceGB 18401
Delivery termsEXW / FOB / CIF / DDP

Why buyers choose this route

  • Plating and dyeing sub-processes planned into the quoted lead time
  • Costed alternatives shown at quotation so the trade-off is visible
  • AQL inspection on every bulk lot with photo reporting before balance payment
  • MOQ quoted per style per colourway, stated before sampling starts
  • Consolidated shipping with documented carton ratios

How the programme runs

  1. Discovery call: quantity, target price, delivery window and compliance needs
  2. Material and finish proposal with costed alternatives
  3. Counter sample built from your tech pack or reference sample
  4. Approval, testing and pre-production sign-off
  5. Bulk production with in-line inspection and photo reporting
  6. Packing, documentation and shipment under the agreed Incoterm

FAQ

Can you handle our own artwork or tooling?

Yes. Artwork files or existing tooling can be used; we confirm tolerances in writing before the first production run.

What are the payment and delivery terms?

Standard terms are a deposit with the order and the balance before shipment, under EXW / FOB / CIF / DDP as agreed.

Do you hold stock for reorders?

Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.

What is the minimum order quantity?

Standard MOQ is 3000 per style per colour. Mixed colourways can be combined on the same spec if the base material is identical.

If you are comparing suppliers, send us the spec they quoted against. We will quote the same spec and show you where the difference sits.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top