Taslan Fabric Sourcing Program for Hat and Cap Makers: Shirts
Taslan Fabric Programme for Hat and Cap Makers: Shirts
This programme covers the full path from a taslan fabric requirement to a repeatable bulk supply for hat and cap makers. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 110 gsm, the finish and the packing, and we hold that specification so every reorder matches the last one. It is built around shirts, which is where most of the specification detail sits.
The most common failure in taslan fabric sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

What the programme covers
- Specification build from your tech pack or a physical reference sample
- Base material and finish options with costed alternatives
- Sampling, testing and approval against EN 71-3
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
Recommended specifications
- Brass — used when strength and abrasion resistance come first
- ABS Resin — used when strength and abrasion resistance come first
- Ceramic — chosen when the item has to survive repeated laundering
- Iron — chosen when the item has to survive repeated laundering

Programme parameters
| Item | Taslan Fabric |
|---|---|
| Target sector | Hat and Cap Makers |
| Target application | Shirts |
| Standard size | 110 gsm |
| Finish options | Matte Black Coating, Antique Copper Finish, Powder Coating |
| Processes | Rotary Printing, Epoxy Coating, Calendering |
| MOQ | 500 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 15-30 days |
| Compliance | EN 71-3 |
| Delivery terms | EXW / FOB / CIF / DDP |
Why buyers choose this route
- Consolidated shipping with documented carton ratios
- Written specification held on file, so every reorder reproduces the approved sample
- Golden sample retained at the factory and a second one held by the buyer
- AQL inspection on every bulk lot with photo reporting before balance payment
- MOQ quoted per style per colourway, stated before sampling starts
How the programme runs
- Discovery call: quantity, target price, delivery window and compliance needs
- Material and finish proposal with costed alternatives
- Counter sample built from your tech pack or reference sample
- Approval, testing and pre-production sign-off
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
FAQ
Can you match a physical sample?
Yes. Send the reference and we reverse engineer the specification, then produce a counter sample for approval before any bulk commitment.
What happens if a bulk lot fails inspection?
The lot is reworked or remade at our cost. Inspection reports are shared before the balance payment is due.
Can you handle our own artwork or tooling?
Yes. Artwork files or existing tooling can be used; we confirm tolerances in writing before the first production run.
What are the payment and delivery terms?
Standard terms are a deposit with the order and the balance before shipment, under EXW / FOB / CIF / DDP as agreed.
Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.