Swing Ticket Sourcing Program for Costume and Theatre: Dresses
Swing Ticket Programme for Costume and Theatre: Dresses
This programme covers the full path from a swing ticket requirement to a repeatable bulk supply for costume and theatre. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 10# Gauge, the finish and the packing, and we hold that specification so every reorder matches the last one. It is built around dresses, which is where most of the specification detail sits.
The most common failure in swing ticket sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

What the programme covers
- Specification build from your tech pack or a physical reference sample
- Base material and finish options with costed alternatives
- Sampling, testing and approval against Sedex SMETA
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
Recommended specifications
- Ceramic — best balance of cost, availability and test performance
- PU Leather — selected for colour depth and finish stability
- Copper — used when strength and abrasion resistance come first
- Stainless Steel — selected for colour depth and finish stability

Programme parameters
| Item | Swing Ticket |
|---|---|
| Target sector | Costume and Theatre |
| Target application | Dresses |
| Standard size | 10# Gauge |
| Finish options | Antique Copper Finish, Epoxy Doming, Piece-Dyed Finish |
| Processes | Heat Setting, Heat Transfer Printing, Anti-Pilling Finish |
| MOQ | 500 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 25-40 days |
| Compliance | Sedex SMETA |
| Delivery terms | EXW / FOB / CIF / DDP |
Why buyers choose this route
- AQL inspection on every bulk lot with photo reporting before balance payment
- One accountable owner from sampling through to ex-factory
- Written specification held on file, so every reorder reproduces the approved sample
- Compliance documentation issued with the shipment, not after it
- Costed alternatives shown at quotation so the trade-off is visible
How the programme runs
- Discovery call: quantity, target price, delivery window and compliance needs
- Material and finish proposal with costed alternatives
- Counter sample built from your tech pack or reference sample
- Approval, testing and pre-production sign-off
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
FAQ
Which compliance documents do you provide?
Sedex SMETA documentation is issued with the shipment. Test reports can be ordered against any additional standard you nominate.
What is the minimum order quantity?
Standard MOQ is 500 per style per colour. Mixed colourways can be combined on the same spec if the base material is identical.
Can you handle our own artwork or tooling?
Yes. Artwork files or existing tooling can be used; we confirm tolerances in writing before the first production run.
Can you match a physical sample?
Yes. Send the reference and we reverse engineer the specification, then produce a counter sample for approval before any bulk commitment.
If you are comparing suppliers, send us the spec they quoted against. We will quote the same spec and show you where the difference sits.