Two-Way Separating Zipper Sourcing Program for PPE Distributors: Scarves
Two-Way Separating Zipper Programme for PPE Distributors: Scarves
This programme covers the full path from a two-way separating zipper requirement to a repeatable bulk supply for ppe distributors. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 8# Gauge, the finish and the packing, and we hold that specification so every reorder matches the last one. It is built around scarves, which is where most of the specification detail sits.
The most common failure in two-way separating zipper sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

What the programme covers
- Specification build from your tech pack or a physical reference sample
- Base material and finish options with costed alternatives
- Sampling, testing and approval against WRAP
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
Recommended specifications
- Copper — selected for colour depth and finish stability
- POM Plastic — chosen when the item has to survive repeated laundering
- TPU — selected for colour depth and finish stability
- Bamboo — used when strength and abrasion resistance come first

Programme parameters
| Item | Two-Way Separating Zipper |
|---|---|
| Target sector | PPE Distributors |
| Target application | Scarves |
| Standard size | 8# Gauge |
| Finish options | Glossy Enamel Coating, Rose Gold Plating, Antique Brass Plating |
| Processes | Flame Retardant Finishing, Yarn Dyeing, Embroidery |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 15-30 days |
| Compliance | WRAP |
| Delivery terms | EXW / FOB / CIF / DDP |
Why buyers choose this route
- Costed alternatives shown at quotation so the trade-off is visible
- MOQ quoted per style per colourway, stated before sampling starts
- AQL inspection on every bulk lot with photo reporting before balance payment
- Written specification held on file, so every reorder reproduces the approved sample
- Golden sample retained at the factory and a second one held by the buyer
How the programme runs
- Discovery call: quantity, target price, delivery window and compliance needs
- Material and finish proposal with costed alternatives
- Counter sample built from your tech pack or reference sample
- Approval, testing and pre-production sign-off
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
FAQ
What is the minimum order quantity?
Standard MOQ is 3000 per style per colour. Mixed colourways can be combined on the same spec if the base material is identical.
Do you hold stock for reorders?
Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.
Can you handle our own artwork or tooling?
Yes. Artwork files or existing tooling can be used; we confirm tolerances in writing before the first production run.
How long does sampling take?
14 working days for the first sample, with 3 days per revision round. Plated or dyed-to-match items add a few days.
Share the programme details and we will propose two alternatives — one optimised for unit cost, one for lead time — and let you choose.