Jeans Button Sourcing Program for Towel and Bathrobe Mills: Blazers
Jeans Button Programme for Towel and Bathrobe Mills: Blazers
This programme covers the full path from a jeans button requirement to a repeatable bulk supply for towel and bathrobe mills. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 50 mm Width, the finish and the packing, and we hold that specification so every reorder matches the last one. It is built around blazers, which is where most of the specification detail sits.
The most common failure in jeans button sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

What the programme covers
- Specification build from your tech pack or a physical reference sample
- Base material and finish options with costed alternatives
- Sampling, testing and approval against REACH SVHC Screening
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
Recommended specifications
- Stainless Steel — chosen when the item has to survive repeated laundering
- POM Plastic — best balance of cost, availability and test performance
- Acrylic — best balance of cost, availability and test performance
- Recycled PET — used when strength and abrasion resistance come first

Programme parameters
| Item | Jeans Button |
|---|---|
| Target sector | Towel and Bathrobe Mills |
| Target application | Blazers |
| Standard size | 50 mm Width |
| Finish options | Laser Engraved Finish, Rainbow Iridescent Finish, Brushed Silver Finish |
| Processes | Warp Knitting, Heat Transfer Printing, Anti-Bacterial Finishing |
| MOQ | 2,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 20-40 days |
| Compliance | REACH SVHC Screening |
| Delivery terms | EXW / FOB / CIF / DDP |
Why buyers choose this route
- MOQ quoted per style per colourway, stated before sampling starts
- Written specification held on file, so every reorder reproduces the approved sample
- One accountable owner from sampling through to ex-factory
- Compliance documentation issued with the shipment, not after it
- Costed alternatives shown at quotation so the trade-off is visible
How the programme runs
- Discovery call: quantity, target price, delivery window and compliance needs
- Material and finish proposal with costed alternatives
- Counter sample built from your tech pack or reference sample
- Approval, testing and pre-production sign-off
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
FAQ
How long does sampling take?
14 working days for the first sample, with 5 days per revision round. Plated or dyed-to-match items add a few days.
What is the minimum order quantity?
Standard MOQ is 2000 per style per colour. Mixed colourways can be combined on the same spec if the base material is identical.
Do you hold stock for reorders?
Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.
Which compliance documents do you provide?
REACH SVHC Screening documentation is issued with the shipment. Test reports can be ordered against any additional standard you nominate.
If you are comparing suppliers, send us the spec they quoted against. We will quote the same spec and show you where the difference sits.